Eva Copper Project — 2020 Technical Report
The Eva Copper Project's Little Eva processing plant is designed to treat 31,200 t/d of blended sulphide and native copper
Eva Copper Project — 2020 Technical Report Read Post »
The Eva Copper Project's Little Eva processing plant is designed to treat 31,200 t/d of blended sulphide and native copper
Eva Copper Project — 2020 Technical Report Read Post »
This report details the recovery methods for the Cantung tungsten-copper milling facility, covering crushing, grinding, flotation, gravity separation, and concentrate
Cantung — Recovery Methods Report Read Post »
A preliminary economic assessment of the Nabanga Project, effective September 30, 2019, evaluates the potential viability of a combined open
Nabanga Project — 2019 Preliminary Economic Assessment Read Post »
The 2025 technical report presents a feasibility-level design for a 15 ktpd gold processing facility at the Mt Todd Gold
Mt Todd Gold Project — 2025 Technical Report Read Post »
This report describes the proposed recovery methods, metallurgical testwork, and processing design for the Frankfield Gold Project as presented in
Frankfield East — 2012 Recovery Methods Report Read Post »
The Rovina Valley project process plant design employs conventional froth flotation to recover copper and gold concentrate from Colnic and
Rovina Valley — NI 43-101 Updated Technical Report Read Post »
This technical report provides updated mineral processing and metallurgical information for the Mpama North and Mpama South deposits within the
2022 Technical Report — Mpama North & South Read Post »
This report presents the proposed processing route and metallurgical assumptions for the La Fortuna project, using a purchased used plant
La Fortuna Gold Project — 2018 Technical Report Read Post »
This report describes the processing methods and metallurgical performance of the Loulo-Gounkoto gold complex carbon-in-leach plant as of March 2023,
Loulo-Gounkoto Gold Complex — 2023 Technical Report Read Post »
This report details the proposed repurposing of the existing Renard diamond processing plant for spodumene concentrate production from the Adina
Adina Lithium Project — 2024 Technical Report Read Post »