Nasedkino — 2012 Technical Report
The Nasedkino gold-copper project proposes a processing route combining gravity concentration, flotation, and cyanidation to produce gold doré and a
Nasedkino — 2012 Technical Report Read Post »
The Nasedkino gold-copper project proposes a processing route combining gravity concentration, flotation, and cyanidation to produce gold doré and a
Nasedkino — 2012 Technical Report Read Post »
This article summarizes the processing design for the San Matías Copper-Gold-Silver Project as presented in its 2021 Technical Report, covering
San Matías Copper-Gold-Silver Project — 2022 Technical Report Read Post »
The 2012 technical report describes the proposed process plant design for the Rosia Montana gold-silver deposit, a large tonnage low
Rosia Montana Project — 2012 Technical Report Read Post »
Source Energy Services’ Sumner silica sand operation in Barron County, Wisconsin, uses an on-site wet plant and a dry plant
Sumner Mine — 2020 Silica Sand Resource Estimates Read Post »
This 2012 technical report covers mineral processing and metallurgical testing for the Taparko-Bouroum gold assets in Burkina Faso. Report context
Taparko-Bouroum Assets — 2012 Technical Report Read Post »
The primary processing option for the Helen and Gap resources is toll milling and treating through a third-party roasting or
Cove Project — 2021 Technical Report Read Post »
The Edikan gold plant, commissioned in 2011 and designed for 5.6 Mt/y nominal capacity, processes sulphide-associated gold ores through a
Edikan Gold Plant — Technical Report Read Post »
The NI 43-101 report for Adyton Resources on Fergusson Island says more metallurgical testing is required before any development decision,
The prefeasibility study outlines a processing route for the Merlin molybdenum-copper-rhenium deposit based on a combination of bench-scale testwork, vendor
Merlin Project — 2011 Prefeasibility Study Read Post »
This feasibility study presents a proposed gold recovery operation using heap leaching and an adsorption-desorption-recovery (ADR) plant, based on extensive
Fenix Gold Project — 2023 Feasibility Study Read Post »