Nyanzaga Gold Project: 5Mtpa Processing Circuit with SAB Grinding & CIL Recovery

  • Project Overview: Perseus Mining’s Nyanzaga Gold Project in Tanzania (Feasibility Study completed June 2025) features a 5Mtpa gold processing plant designed by Lycopodium Minerals.
  • Key Circuit Components:
    – Crushing: Metso Superior MKIII gyratory crusher (375 kW)
    – Grinding: SAB circuit (9.75m SAG mill + 7.32m ball mill, 10.5MW each)
    – Gravity Recovery: Centrifugal concentrators + intensive cyanidation
    – Leaching: 24-hour CIL circuit (6×3,250m³ tanks) with pre-oxidation
    – Gold Recovery: Split AARL elution + electrowinning
  • Design Parameters:
    – Target grind size: P₈₀ 75µm
    – Gold recovery: 86% (design)
    – Gravity recovery: 30% of total gold
    – Throughput flexibility: 4.76-6.0Mtpa depending on ore characteristics
  • Mercury Handling: Dedicated abatement system for 1.1g/t Hg feed, including retort oven and carbon filtration.
  • Water Management: 90%+ water recycling via thickeners and TSF decant system, with Lake Victoria as primary raw water source.
  • Power Demand: 28.6MW average draw (250.8GWh/year), primarily for grinding (158.6GWh/year).
  • Ore Blend: 11.7% oxide + 88.3% fresh ore (mudstone/sandstone dominant) over LOM.