NI 43-101 Technical Report

Company Not Specified
Mine Project
Region Not Specified
Commodities Gold, Silver

Executive Summary

This technical report section outlines the recovery methods for the Project. The process utilizes a conventional three-stage crushing circuit feeding a valley fill heap leach. Gold and silver recovery is achieved through carbon adsorption columns, followed by stripping, regeneration, electrowinning, and smelting to produce doré bars. The design capacity is 5 Mt/y of leach feed. Operations are scheduled for 24 hours a day, seven days a week.

Processing Profile

  • Crushing: Three-stage crushing and screening (Primary, Secondary, Tertiary)
  • Milling: N/A
  • Flotation: N/A
  • Leaching: Valley Fill Heap Leach
  • Recovery: Carbon Adsorption, Electrowinning, Smelting

Website: https://www.merriam-webster.com/dictionary/project

Report Date: 

Region: Not Specified

Project Status:

Commodity: Gold, Silver

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 