NI 43-101 Technical Report – Preliminary Economic assessment Dyke #5 – Sirmac Property

Company Sirmac
Date Not Specified
Region Not Specified
Commodities Lithium
Status Preliminary Economic Assessment

Executive Summary

This NI 43-101 Technical Report outlines the Preliminary Economic Assessment for the Dyke #5 project located on the Sirmac Property. The mineralized material is classified as Direct Shipping Ore (DSO), meaning it is intended to be sold as mineralized material similar to other iron projects, pending agreement with the processing company and plant.

Metallurgical testing detailed in Section 13 indicates positive results, suggesting the material is suitable for existing processing plants without limitation. Specifically, the Sirmac pegmatite #5 dyke testing demonstrates the potential to produce a spodumene concentrate grading 6% Li2O and above, confirming the viability of the lithium resource for further development.

Processing Profile

  • Recovery Method: Direct Shipping Ore (DSO)
  • Target Product: Spodumene Concentrate
  • Target Grade: 6% Li2O

Reports

Website: https://visionlithium.com/sirmac/

Report Date: Not Specified

Region: Not Specified

Project Status: Preliminary Economic Assessment

Commodity: Lithium

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics

Scroll to Top