Kitsault Molybdenum Project — 2014 Technical Report

This technical report outlines the recovery methods for the Kitsault Molybdenum Project located in British Columbia, Canada. The proposed process design features a concentrator with a nominal processing capacity of 40,000 tonnes per day based on the 75th percentile ore characteristics. The metallurgical testwork utilized samples from drilling campaigns in 2008 and 2011 to establish the process design criteria for the facilities.

Kitsault Molybdenum Project — 2014 Technical Report Read Post »

Figure 17-1 San Albino Mill Flowsheet

San Albino Project — Process Design Report (Report No. 300)

This technical report outlines the process design for the San Albino Project, developed by P&E Mining Consultants Inc. The proposed processing plant is designed for a throughput of 250 tonnes per day, utilizing a combination of gravity recovery and Carbon-in-Leach (CIL) technology for gold extraction. The circuit includes primary, secondary, and tertiary crushing stages followed by ball milling to achieve a P80 of 70 microns.

San Albino Project — Process Design Report (Report No. 300) Read Post »

Process diagram from technical-report PDF page 231

Agua Rica Integrated Project — 2022 Technical Report

This NI 43-101 Technical Report details the recovery methods for the Agua Rica Integrated Project, which aims to utilize the existing Alumbrera processing facilities to treat ore from the new Agua Rica mine. The Alumbrera operation was previously shut down in October 2018 after depleting its open pit mineral reserves. The project involves crushing Agua Rica ore at the new mine site and conveying it 35 km west to the existing Alumbrera mill feed stockpile. The nominal Life of Mine (LOM) for the project is 28 years, with a planned throughput increase from 90,000 tpd to 110,000 tpd (40 Mtpa).

Agua Rica Integrated Project — 2022 Technical Report Read Post »

Figure 17-6 Process flow diagram of the Magdalena Washing Plant

Qualified Persons’ Report on Forbes Coal’s Dundee Operations

This report details the recovery methods and processing operations for Forbes Coal’s Dundee Operations in KwaZulu-Natal, South Africa. The operations consist of two coal processing plants, the Coalfields Plant and the Magdalena Plant, alongside a Calcine Plant for anthracite treatment. Site visits were conducted in October 2012, updating performance data from a 2011 report.

Qualified Persons’ Report on Forbes Coal’s Dundee Operations Read Post »

El Roble 2024 Report: 850 t/d SAG and Flash-Flotation Copper-Gold Mill Recovered 91.7% of Copper in 2023 and Has Added Ceramic Disc Filtration for Dry-Stack Tailings

The El Roble Mine process plant operates with a rated nominal throughput capacity of 850 tonnes per day. The processing methods consist of conventional crushing, grinding, and flotation to produce a copper-gold concentrate. The plant utilizes a SAG mill and ball mill circuit followed by multiple stages of flotation cells including OK, Denver, and Sub A styles. Process tailings are deposited in an impoundment facility situated along the banks of the Atrato River, with a dewatering plant implemented for dry stack disposal.

El Roble 2024 Report: 850 t/d SAG and Flash-Flotation Copper-Gold Mill Recovered 91.7% of Copper in 2023 and Has Added Ceramic Disc Filtration for Dry-Stack Tailings Read Post »

Maya Gold and Silver — Amizmiz Technical Report

This technical report outlines the proposed recovery method for the Amizmiz property, operated by Maya Gold and Silver. The project is currently in the development stage, with recovery methods based on metallurgical testing performed at Reminex’s Research Centre and Laboratory. The proposed circuit includes gravimetric, flotation, and cyanidation processes, designed to recover gold from the Az and TRN structures. A daily ore mill capacity of 150 t/day has been adopted based on inferred mineral resources and previous results from similar Moroccan mining projects.

Maya Gold and Silver — Amizmiz Technical Report Read Post »

Figure 41: Plant Operation – Flowsheet – SJE-Huari

NI 43-101 Technical Report on Resources – Invicta Gold Project

This section of the NI 43-101 Technical Report details the recovery methods and pilot plant results for the Invicta Gold Project. Based on locked-cycle test results, metallurgical balances were prepared for two tests conducted in a semi-continuous pilot plant using several tonnes of representative samples. The pilot plant successfully produced two distinct concentrates: a copper concentrate and a lead concentrate. The overall recoveries and grades for the saleable metals in these concentrates were summarized in the report tables, providing a baseline for the proposed processing flow sheet.

NI 43-101 Technical Report on Resources – Invicta Gold Project Read Post »

Bell Mountain Project — Updated Preliminary Economic Assessment

This Updated Preliminary Economic Assessment outlines the recovery methods for the Bell Mountain Project deposits, including Spurr, Varga, Sphinx, and East Ridge. Based on surface proximity and preliminary metallurgical test work, valley leach is the anticipated recovery method. The mineralized material features a significant silver content with a 25:1 Ag:Au ratio in some areas.

Bell Mountain Project — Updated Preliminary Economic Assessment Read Post »

San Ramon Deposit — 2014 Technical Report

The San Ramon project, developed by Red Eagle Mining Corporation in Colombia, outlines a proposed processing facility for an underground mining operation. The design focuses on a Carbon-in-Leach (CIL) circuit capable of processing 1,000 tonnes per day of gold-bearing material. The facility includes primary and secondary crushing, ball-mill grinding, agitated leaching, and precious-metal recovery via electrowinning and smelting to produce a gold doré product.

San Ramon Deposit — 2014 Technical Report Read Post »

El Quevar Project — 2018 Technical Report

This section of the NI 43-101 Technical Report details the proposed recovery methods for the El Quevar Project, focusing on the processing plant design to recover silver from the Yaxtché sulfide deposit. The design basis is established to process 1,200 tonnes per day of mineralized material sourced from an underground mine. The objective is to produce a bulk silver concentrate with a target grade of approximately 11.5 kg/t Ag through conventional crushing, grinding, and flotation techniques.

El Quevar Project — 2018 Technical Report Read Post »