Mine 14 — Technical Report
This section of the Technical Report outlines the Recovery Methods for the Mine 14 Project, focusing on the design and operation of a Coal Preparation Plant (CPP). Summit intends to sell the Mine 14 coal into export metallurgical coal markets. Due to the high ash content of the Run-of-Mine (ROM) coal (+15% adb), processing is required to reduce ash below 8% db to meet market specifications. Dr. Peter J. Bethell of Bethell Processing Solutions LLC was engaged to design the CPP flowsheet, which serves as the basis for permitting and construction specifications.
Mine 14 — Technical Report Read Post »





