Mineral Processing Circuit

Mine 14 — Technical Report

This section of the Technical Report outlines the Recovery Methods for the Mine 14 Project, focusing on the design and operation of a Coal Preparation Plant (CPP). Summit intends to sell the Mine 14 coal into export metallurgical coal markets. Due to the high ash content of the Run-of-Mine (ROM) coal (+15% adb), processing is required to reduce ash below 8% db to meet market specifications. Dr. Peter J. Bethell of Bethell Processing Solutions LLC was engaged to design the CPP flowsheet, which serves as the basis for permitting and construction specifications.

Mine 14 — Technical Report Read Post »

Blanket Gold Mine process flowsheet: Blanket Plant Process Flow Diagram`

Blanket Mine’s Rod Mill, Gravity and Oxygen-Assisted CIL Plant Recovers 93.8% of Gold at About 66 kt a Month

The Blanket Gold Mine plant operates as a conventional crushing, milling, Carbon-in-Leach (CIL), batch elution, and smelting facility. The plant is currently designed to process Run of Mine (RoM) ore at a rate of 70.1 kilotonnes per month (ktpm). While the crushing and milling circuits are optimized for RoM, the CIL and downstream circuits were originally designed to treat tailings dam material at a higher rate of approximately 110 ktpm. The facility utilizes a combination of gravity concentration and leaching to recover gold, with historic production data from 2012 to 2022 showing an average milled tonnage of 752 kt/yr and an overall recovery rate averaging 93.41%.

Blanket Mine’s Rod Mill, Gravity and Oxygen-Assisted CIL Plant Recovers 93.8% of Gold at About 66 kt a Month Read Post »

Figure 17-1: Process Flowsheet

Merian Operations — 2019 NI 43-101 Technical Report

The Merian Operations process plant is designed to treat a range of 8–12 megatonnes per annum (Mt/a) of ore, accommodating a mix of fresh rock and saprolite. The flowsheet design leverages well-proven industry practices to handle the specific material characteristics of the Surinamese deposits, ensuring robust material handling to avoid mass flow issues with saprolite. The plant operates with a design availability of 91%, utilizing standby equipment in critical areas to maintain throughput targets.

Merian Operations — 2019 NI 43-101 Technical Report Read Post »

Pasto Bueno Tungsten Mine — 2012 Technical Report

The Pasto Bueno Tungsten Mine, operated by Malaga, Inc., is an underground operation located in Peru. The mine processes ore through a sequential three-plant system consisting of the Huaura Gravity Separation Plant, Huaura Magnetic Separation Plant, and Consuzo Magnetic Separation Plant. The facility currently processes approximately 350 tonnes of ore per day, with a nominal capacity of 500 tonnes per day.

Pasto Bueno Tungsten Mine — 2012 Technical Report Read Post »

Tiger Deposit process flowsheet: Simplified Process Flowsheet

Technical Report — Tiger Deposit, Rackla Gold Project

This Technical Report and Preliminary Economic Assessment outlines the proposed processing plant for the Tiger Deposit at the Rackla Gold Project in Yukon, Canada. The facility is designed to treat gold mineralization from an open pit mine at a rate of 1,500 tonnes per day. The plant will co-process oxide and sulphide mineralization using a conventional Carbon-in-Leach (CIP) cyanidation process to produce gold doré.

Technical Report — Tiger Deposit, Rackla Gold Project Read Post »

Figure 17-1: Plant Process Flowsheet 2022-2023

Condestable Mine — 2024 Technical Report

This NI 43-101 Technical Report details the recovery methods and processing capabilities of the Condestable Mine, operated by Ariana Management Corporation S.A.C. The report, dated April 12, 2024, outlines the operational status of the mine which sources ore from the Condestable and Raúl underground mines. The concentrator plant is located on a steep hillside and has undergone recent expansion to increase its processing capacity.

Condestable Mine — 2024 Technical Report Read Post »

Timmins West Mine — 2021 Technical Report

This technical report details the mineral processing operations for the Timmins West Mine (TWM) ore, which is hauled via surface highway trucks to the Bell Creek Mill facility in South Porcupine, Ontario. The Bell Creek Mill is a designed 5,468 tpd processing plant that utilizes a one-stage crushing circuit, ore storage dome, one-stage grinding circuit with gravity recovery, followed by pre-oxidation and cyanidation of the slurry with carbon-in-leach (CIL) and CIP recovery. The mill has undergone significant expansions since its re-commissioning in 2009, reaching a maximum one-day tonnage of 6,000 tpd in 2020.

Timmins West Mine — 2021 Technical Report Read Post »

Juanicipio — NI 43-101 Technical Report

The Juanicipio Mineral Resource and Mineral Reserves NI 43-101 Technical Report details the processing operations for the Juanicipio project, operated by MAG Silver Corp. The processing plant commenced operation in March 2023 with a nominal capacity of 4,000 tpd. The facility processes underground ore through a comminution circuit involving primary jaw crushing, SAG and ball milling, followed by sequential flotation circuits for lead, zinc, and pyrite concentrates. Recent operational data from 2023 indicates the plant is achieving designed throughput and recoveries for silver, lead, and zinc, while gold recovery remains in an optimization phase.

Juanicipio — NI 43-101 Technical Report Read Post »

Dewey Burdock PEA — 2025 Technical Report

This Preliminary Economic Assessment (PEA) outlines the processing facilities and recovery methods for the Dewey Burdock uranium project. The project utilizes a Central Processing Plant (CPP) located on the Burdock property and a Satellite facility at Dewey, connected by a resin transfer system over a distance of approximately four miles. The processing circuits are designed to recover uranium from pregnant lixiviant solution using ion exchange (IX), elution, precipitation, dewatering, drying, and packaging.

Dewey Burdock PEA — 2025 Technical Report Read Post »

Figure 13-1: 2006 Consultec Mass Balance

Wood Mountain Project — 2024 Technical Report

The Wood Mountain Project, operated by Whitemud Resources Inc., centers on the Gollier Creek metakaolin facility located in Saskatchewan, Canada. Originally operational between 2008 and 2012, the facility faced significant economic challenges due to processing inefficiencies, specifically a large recirculating load of metakaolin from the rotary calciner to the dryer. This bottleneck restricted feed rates and reduced yield to approximately 9%. Following a design review in 2023, modifications began in December 2023 to address these issues, with a target recommissioning in the second half of 2024.

Wood Mountain Project — 2024 Technical Report Read Post »

Scroll to Top