Dingman Gold Project — 2013 Technical Report

Company Upper Canada Gold Corporation
Date April 30, 2013
Region Ontario, Canada
Commodities Gold

Executive Summary

This technical report outlines the proposed recovery methods for the Dingman Gold Project by Upper Canada Gold Corporation. The process design integrates a series of unit operations including crushing, grinding, screening, gravity recovery, flotation, and a Carbon-in-Leach (CIL) circuit. The objective is to produce a suitable sized product for gravity recovery, followed by flotation and cyanidation leaching to extract gold-bearing pregnant solution.

The gold is subsequently absorbed into carbon within the CIL process. The loaded carbon undergoes stripping via electrowinning, depositing gold onto cathodes which are then melted in a refractory oven to produce doré bars. Additionally, the report evaluates off-site processing of the flotation concentrate as an alternative to reduce capital costs and simplify permitting by removing cyanidation from the project site, though on-site processing was found to be more favorable.

Website: https://www.geologyontario.mndm.gov.on.ca/mndmfiles/MDI/data/records/MDI31C12SE00040.html

Report Date: April 30, 2013

Region: Ontario, Canada

Project Status:

Commodity: Gold

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 