Houndé Gold Mine — 2020 Technical Report

This technical report describes the Houndé Gold Mine processing facilities as designed and operated by Endeavour Mining Corporation, with an effective date of 31 December 2019.

Report context

This technical report on the Houndé Gold Mine, prepared for Endeavour Mining Corporation, is dated June 2020 and carries an effective date of 31 December 2019. The property is centred on Latitude 11°24'57.6''N and Longitude 3°31'51.6''W in Burkina Faso. The report addresses mineral processing and metallurgical testing, process plant design and description, and historical operating performance.

Processing route

Process selection and design philosophy

The process selection at Houndé was based on a design philosophy outlined in Section 17.2.1 of the report. The report states that the process flowsheet is described in Section 17.2.2. The plant description covers the Houndé Process Plant as detailed in Section 17.3, with electrical supply addressed in Section 17.4 and control philosophy in Section 17.5.

Metallurgical testing

Section 13 of the report covers mineral processing and metallurgical testing. A metallurgical summary is provided in Section 13.2. Metallurgical sampling is described in Section 13.3, with sampling conducted for various deposit types including Vindaloo, Bouéré, Dohoun, and Kari deposits. Detailed metallurgical testing is reported in Section 13.4, which includes testwork results that underpin the process design assumptions.

Historical operating performance

Section 17.7 of the report presents historical performance data for the Houndé process plant. This section provides actual operating results from the facility. Section 17.8 addresses the metallurgical life of mine plan and associated assumptions used for forward-looking estimates.

Key reported parameters

Parameter Value Basis
Property centre coordinates 11°24'57.6''N, 3°31'51.6''W Actual
Report effective date 31 December 2019 Design
Report filing date 15 June 2020 Actual
Process plant description Section 17.3 Design
Metallurgical testing Section 13.4 Testwork
Historical plant performance Section 17.7 Actual operating data
Metallurgical life of mine plan Section 17.8 Design

Project website: https://www.endeavourmining.com/our-portfolio/hounde-mine/

Technical qualifications

The report states that metallurgical testwork is detailed in Section 13.4, and the process flowsheet is described in Section 17.2.2. The report does not provide specific numerical design criteria for the process plant in the sections extracted. No flowsheet diagrams were included in the provided text. The historical performance data referenced in Section 17.7 is not quantified in the extracted material. The metallurgical life of mine plan assumptions in Section 17.8 are not detailed in the provided sections.

Source: Endeavour Mining Corporation, Houndé Gold Mine Technical Report, effective date 31 December 2019, filed 15 June 2020, Sections 13, 17.

Mineral processing basics

Scroll to Top