La Guitarra Silver Mine — NI 43-101 Technical Report
| Company | First Majestic |
| Mine | La Guitarra Silver Mine |
| Date | Unknown |
| Region | Temascaltepec, Edo. Mexico, Mexico |
| Commodities | Silver, Gold |
| Mine Type | Underground |
| Throughput | 520 tpd |
| Status | Operating |
Executive Summary
The La Guitarra Silver Mine utilizes a flotation processing method to recover silver and gold-bearing minerals. The plant has an installed capacity of 520 tonnes per day and processes ore through a two-stage crushing circuit followed by ball mill grinding. The ground ore undergoes bulk flotation to produce a concentrate, which is then thickened and filtered before shipment.
The processing flowsheet includes primary jaw crushing and secondary cone crushing to reduce ROM material to minus 3/8 inches. Four independent ball mill circuits grind the ore to a P80 of 115 µm. Flotation consists of primary rougher, scavenger, and cleaner stages using Wemco cells. Final concentrates are thickened and filtered to approximately 10% humidity for transport to the port of Manzanillo.
Tailings are pumped to an impoundment 1.3 km away, with 92% of plant water requirements met through recycled water from the tailings and concentrate thickening processes.
Website: https://www.firstmajestic.com/investors/news-releases/first-majestic-announces-closing-sale-of-la-guitarra-to-sierra-madre
Report Date: Unknown
Region: Temascaltepec, Edo. Mexico, Mexico
Project Status: Operating
Commodity: Silver, Gold
Throughput: 520 tpd
Mine Life:
Mine Type: Underground
Ore type: