The Mercedes Mine processing facility employs conventional milling with Merrill-Crowe precious metal recovery, capable of processing approximately 2,000 tonnes per day (tpd). The plant features a comprehensive circuit including three-stage crushing, grinding, cyanide leaching, CCD washing, and specialized recovery systems for gold and silver extraction.

Key Process Stages

  • Three-Stage Crushing: Primary jaw crusher (89mm product), secondary cone crusher (19mm product), and tertiary cone crusher (9.5mm product) with screening between stages
  • Grinding & Classification: Single 5.03m x 8.84m ball mill (3,430 kW) in closed circuit with 254mm hydrocyclones, achieving P80 of 45µm
  • Leaching: Four 9.3m x 9.9m agitated tanks with 24-hour retention time at 50% solids
  • CCD Circuit: Four 16.4m diameter thickeners for solution recovery
  • Merrill-Crowe Recovery: Zinc dust cementation process handling 155,000 oz gold and 595,000 oz silver annually
  • Tailings Treatment: INCO SO2-air cyanide detoxification in two 7.5m x 8.5m reactors
  • Refining: Retort furnaces for mercury removal and diesel-fired smelting to produce doré bars

Critical Data

Parameter Value
Design Throughput 2,000 tpd
Primary Crusher Power 112 kW
Secondary/Tertiary Crusher Power 224 kW each
Ball Mill Power 3,430 kW
Fine Ore Bin Capacity 3,500 tonnes live (5,275 total)
Leach Retention Time 24 hours
Annual Gold Recovery Capacity 155,000 oz
Annual Silver Recovery Capacity 595,000 oz
Detoxification Retention Time 1.5 hours per tank

Recent Optimization

In 2021, plant modifications were implemented to recirculate cyanide-containing solution from the CCD circuit to the grinding circuit, reducing overall cyanide consumption while maintaining recovery efficiency.