Executive Summary
This technical report section outlines the recovery methods for the Project. The process utilizes a conventional three-stage crushing circuit feeding a valley fill heap leach. Gold and silver recovery is achieved through carbon adsorption columns, followed by stripping, regeneration, electrowinning, and smelting to produce doré bars. The design capacity is 5 Mt/y of leach feed. Operations are scheduled for 24 hours a day, seven days a week.
Processing Profile
- Crushing: Three-stage crushing and screening (Primary, Secondary, Tertiary)
- Milling: N/A
- Flotation: N/A
- Leaching: Valley Fill Heap Leach
- Recovery: Carbon Adsorption, Electrowinning, Smelting