| Company | i-80 Gold Corp |
| Date | 2021 |
| Region | Elko County, Nevada |
| Commodities | Gold, Silver |
| Mine Type | Open Pit, Underground |
| Throughput | 135,000 tpd |
| Mine Life | 19 years |
| Status | Development |
Executive Summary
The Preliminary Feasibility Study for the South Arturo Mine, dated January 2021, outlines a satellite operation to Nevada Gold Mines’ (NGM) Goldstrike facility in Elko County, Nevada. The project is held by i-80 Gold Corp with a 40% interest and is operated in conjunction with Premier Gold Mines Ltd. and NGM. The mine utilizes existing infrastructure at Goldstrike for processing, including the roaster and autoclave circuits, while developing its own open pit and underground (El Niño) mining capabilities.
Ore processing options include ROM heap leaching for oxide material, milling with Carbon-in-Leach (CIL) for oxide ore, and roasting or pressure oxidation (autoclave) for refractory sulphide ores. The open pit is designed for a throughput of 135,000 tons per day. The project life extends from 2021 through 2039, with production primarily focused on gold and silver recovery.
Financial analysis indicates a net present value of US$83.7 million at a 5% discount rate for i-80’s interest. The project demonstrates robust economics with a breakeven gold price of $811/oz. Positive cash flow is expected from 2021 to 2024, with a temporary dip in 2025 due to pre-stripping, resuming thereafter until 2039.
Processing Methods
- Crushing: Primary and Secondary Crushing, Dry Grinding
- Milling: Semi-Autogenous Grinding (SAG), Ball Mill
- Flotation: N/A
- Leaching: Carbon-in-Leach (CIL), Carbon-in-Column (CIC), Resin-in-Leach (RIL), Heap Leach
- Roasting: Fluidized Bed Roaster
- Pressure Oxidation: Autoclave (POX)
Website: https://www.i80gold.com/i-80-gold-provides-south-arturo-update-in-nevada/
Report Date: 2021
Region: Elko County, Nevada
Project Status: Development
Commodity: Gold, Silver
Throughput: 135,000 tpd
Mine Life: 19 years
Mine Type: Open Pit, Underground
Ore type:
Technical report and processing history
The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.
South Arturo Mine — 2018 Technical Report
South Arturo Mine — 2018 Technical Report
Company: Premier Gold Mines Limited
Date: March 26, 2018
Report Type: NI 43-101 Technical Report
Consultant: RPA (Roscoe Postle Associates)
Executive Summary
This technical report describes the South Arturo Mine project located in Nevada, USA. The mine proposes to process ore through one of three possible routes depending on ore characteristics and economics: ROM heap leaching, milling and CIL (Carbon-in-Leach), or roasting and CIL. Metallurgical testing and mineralogical studies were conducted to support a Feasibility Study. The majority of precious metal production will come from ore trucked to existing Barrick processing circuits located approximately 12.9 km away over improved gravel roads. The processing route will be selected based on maximizing net cash flow.
Processing Methods
ROM Heap Leaching
ROM material will be segregated in the waste dump for potential future heap leach processing. Material will be placed on a permanent leach pad by haul trucks, with cyanide solution distributed via drip emitters. Pregnant solution will be collected and pumped to a carbon adsorption circuit. Loaded carbon will be trucked to the existing autoclave carbon processing circuit for stripping and refining.
Oxide Ore Milling/CIL
Oxidized mill grade ore will be processed using the existing grinding and CIL circuits at Cortez on a campaign basis. The circuit includes crushing, semi-autogenous grinding (SAG), ball milling, grind thickening, carbon-in-column (CIC) circuit, CIL circuit, tailings CCD wash thickener circuit, carbon stripping and reactivation, and a refinery to produce gold doré.
Roaster/CIL
Refractory carbonaceous and sulphidic ore will be toll processed at the Goldstrike roaster circuit on a campaign basis. The roaster pre-oxidizes the ore to enable effective processing in a traditional CIL circuit.
Key Commodities
- Gold (precious metals)
Related Entities
Website: https://miningdataonline.com/property/1745/El-Nino-(South-Arturo)-Mine.aspx
Report Date:
Region:
Project Status:
Commodity:
Throughput:
Mine Life:
Mine Type:
Ore type: