- Project: Salave Gold Project in Asturias, Spain, developed by Black Dragon Gold Corp. (Technical Report: May 2025).
- Process Flow: Two-stage crushing (jaw + cone crusher) → ball mill grinding (target: 80% passing 75µm) → bulk sulphide flotation (rougher + cleaner stages).
- Key Reagents: Potassium amyl xanthate (PAX) collector, CuSO4 activator, and MIBC frother.
- Concentrate: Targets ±65 g/t Au, dewatered via thickener + pressure filter for transport.
- Tailings Management: Thickened tailings split between pastefill (cemented backfill for underground) and TSF storage (passivated with cement).
- Throughput: Assumes ROM blend of Upper Zone (pyrite-rich) and Lower Zone (arsenopyrite-rich) ore.
- Innovation: Simplified flotation circuit with no regrind, reducing operational complexity.

