Savkino Deposit — 2011 Technical Report

Company Ildikangold
Date 2011
Region Russia
Commodities Gold
Mine Type Open Pit
Throughput 500,000 t/y
Mine Life 10 years
Status Operating

Executive Summary

The Savkino deposit is operated by Ildikangold using a heap leaching process for gold recovery. Initial design capacity was 500,000 tonnes per year at 2.0 g/t Au. Operations faced challenges with particle size control and seasonal crushing limitations, leading to lower initial recoveries. Significant improvements were made between 2008 and 2011, including the installation of a secondary cone crusher and optimized agglomeration, which increased gold recovery to over 80%. The mine is expected to expand production with a new processing line.

Processing Profile

Reports

Website: https://www.mining-technology.com/projects/savkino-gold-project/

Report Date: 2011

Region: Russia

Project Status: Operating

Commodity: Gold

Throughput: 500,000 t/y

Mine Life: 10 years

Mine Type: Open Pit

Ore type: 