Torlon Hill — Preliminary Economic Assessment

Company Firestone Ventures Inc.
Mine Torlon Hill
Date TBD
Region Unknown
Commodities Zinc, Lead, Silver
Throughput 93 tph
Status Development

Executive Summary

This section outlines the proposed recovery methods for the Torlon Hill project, detailing a process plant based on crushing, screening, and Dense Medium Separation (DMS) upgrading. The ore will undergo three-stage crushing followed by DMS pre-concentration before milling and differential flotation. The flotation concentrates will be filtered, dried, and shipped for direct sale to international clients.

The design criteria presented are preliminary and subject to confirmatory testwork to finalize the design. The process includes specific battery limits for feed, product, tailings, water, power, and air. Infrastructure for water, air, slimes, and DMS tailings deposition is included in the study.

The plant is designed to process 0.6 Mtpa with a design throughput of 93 tph. The circuit utilizes self-induced aeration cells for flotation, generating lead and zinc concentrates that are cleaned in closed circuit with their respective roughing sections.

Website: https://firestoneventures.com/s/NewsReleases.asp%3FReportID=129701&_Title=Firestone-Ventures-Begins-Drilling-at-Torlon-Hill-High-Grade-Zinc-Project.html

Report Date: TBD

Region: Unknown

Project Status: Development

Commodity: Zinc, Lead, Silver

Throughput: 93 tph

Mine Life: 

Mine Type: 

Ore type: 