| Company | Firestone Ventures Inc. |
| Mine | Torlon Hill |
| Date | TBD |
| Region | Unknown |
| Commodities | Zinc, Lead, Silver |
| Throughput | 93 tph |
| Status | Development |
Executive Summary
This section outlines the proposed recovery methods for the Torlon Hill project, detailing a process plant based on crushing, screening, and Dense Medium Separation (DMS) upgrading. The ore will undergo three-stage crushing followed by DMS pre-concentration before milling and differential flotation. The flotation concentrates will be filtered, dried, and shipped for direct sale to international clients.
The design criteria presented are preliminary and subject to confirmatory testwork to finalize the design. The process includes specific battery limits for feed, product, tailings, water, power, and air. Infrastructure for water, air, slimes, and DMS tailings deposition is included in the study.
The plant is designed to process 0.6 Mtpa with a design throughput of 93 tph. The circuit utilizes self-induced aeration cells for flotation, generating lead and zinc concentrates that are cleaned in closed circuit with their respective roughing sections.
Website: https://firestoneventures.com/s/NewsReleases.asp%3FReportID=129701&_Title=Firestone-Ventures-Begins-Drilling-at-Torlon-Hill-High-Grade-Zinc-Project.html
Report Date: TBD
Region: Unknown
Project Status: Development
Commodity: Zinc, Lead, Silver
Throughput: 93 tph
Mine Life:
Mine Type:
Ore type: