Tower Gold Project — 2025 Preliminary Economic Assessment

Tower Gold Project — 2025 Preliminary Economic Assessment

Company Unknown
Mine Tower Gold Project
Date 2025

Executive Summary

The 2025 Preliminary Economic Assessment for the Tower Gold Project outlines a robust conventional gold recovery flowsheet designed to process approximately 9.5 million tonnes per annum of fresh rock. The project leverages metallurgical testwork to optimize gold recovery through a circuit that includes primary crushing, grinding to a P80 of 75 µm, and a specialized leach-CIP configuration.

The processing facility is engineered for high operational availability, utilizing a pre-leach thickener for slurry consistency and a dedicated cyanide destruction circuit using SO2/O2 technology to ensure environmental compliance. With a nominal throughput of 26,027 tonnes per day and an overall gold recovery rate of 92.7%, the project is positioned to align with industry-standard best practices for gold processing and economic development.

Website: https://stllrgold.com/news/stllr-gold-commences-tower-gold-project-environmental-baseline-studies

Report Date: 2025