Tucano Gold Mine: Hybrid CIL Processing Circuit

Overview

The Tucano Gold Mine features a sophisticated mineral processing circuit designed to handle 3.4-3.6 Mt/a of predominantly sulphide ore (90%). The plant utilizes a SAG/ball mill grinding circuit feeding a hybrid carbon-in-leach (CIL) system with enhanced oxygen injection, followed by cyanide detoxification of tailings. The 2018 expansion project added critical infrastructure including a new ball mill, pre-leach thickener, and oxygen plant to improve processing efficiency.

Key Process Stages

  • Crushing: METSO C-150 jaw crusher (1400mm x 1200mm) with 125mm CSS, feeding through a vibrating grizzly for ore classification
  • Grinding: 7MW Outotec SAG mill (7.32m diameter x 7.95m EGL) in open circuit followed by 6MW ball mill in closed circuit with 10 hydrocyclones (80% < 75μm product)
  • Pre-Leach Thickening: 28m diameter Outotec thickener with 24-hour residence time at design capacity
  • Hybrid CIL: 1x2650m³ pre-leach tank (>15ppm DO) + 6x2650m³ CIL tanks with mechanical agitators and inter-tank screens
  • Elution: Zadra pressure system (135°C) with 720kW heater processing 4.8t carbon/day
  • Tailings: Cyanide detoxification using SMBS/lime/copper sulphate (60min residence) before deposition in TSF
  • Gold Recovery: Electrowinning cells, drying oven, and two gas-fired furnaces producing doré bars

Critical Data

Parameter Value
Design Throughput 3.6 Mt/a (450 t/hr)
Power Consumption 17 MW (fresh rock)
Grinding P80 <75μm
Leach Residence Time 24 hours
Oxygen Levels >15ppm in pre-leach
Carbon Regeneration 700°C kiln temperature
Cyanide Destruction Reduces to ~10ppm in TSF

Process Consumables

  • Quicklime (pH control)
  • Sodium cyanide (gold dissolution)
  • Lead nitrate (leach enhancement)
  • Hydrochloric acid (carbon washing)
  • SMBS + copper sulphate (cyanide destruction)
  • Oxygen (leach optimization)