| Company | Galleon Gold Corp. |
| Date | 2021 |
| Region | Timmins, Ontario, Canada |
| Commodities | Gold |
| Mine Type | Underground |
| Throughput | 2,400 tpd |
| Status | Development |
Executive Summary
This Pre-Feasibility Study (PEA) for the West Cache Gold Property outlines metallurgical testwork and processing options for gold recovery. Based on recent testwork, two primary flowsheets were evaluated: a dedicated gravity-float-leach option and toll processing at existing regional facilities. The preferred flowsheet involves gravity concentration of free gold using centrifuges and tabling, followed by flotation of a gold-sulphide concentrate and cyanidation of the reground float concentrate. This option achieved combined recoveries averaging 97% and produces cyanide-free flotation tailings suitable for mine backfill.
Toll processing options were also analyzed, with Option A (4,500 tpd capacity, 25 km haulage) deemed more attractive than Option B (2,000 tpd capacity, 60 km haulage). Option A includes gravity concentration and cyanide leach with CIP recovery, achieving 96.9% recovery on recent feed. The study assumes 2,400 tpd of West Cache material would be processed via toll processing, with a fraction of tailings back-hauled for backfill. Sorting considerations using X-ray transmission (XRT) were discussed but not tested, pending further mineralogical analysis to determine free gold deportment.
Processing Options
- Gravity Concentration:: Centrifuges and tabling for free gold recovery.
- Flotation:: Gold-sulphide concentrate recovery.
- Leaching:: Cyanide leach with Carbon-in-Pulp (CIP) recovery.
- Grinding:: P80 approximately 60 µm.
- Sorting:: XRT sorting considered for waste rejection.
Reports
- entities/WestCache_Mine
- entities/GalleonGold_Corp
Website: https://galleongold.com/projects/west-cache-gold-project/
Report Date: 2021
Region: Timmins, Ontario, Canada
Project Status: Development
Commodity: Gold
Throughput: 2,400 tpd
Mine Life:
Mine Type: Underground
Ore type: Sulphide/Free Gold