Wonmunna Iron Ore Mine — 2022 Technical Report

Company Vox Royalty Corp.
Date 2022
Region Western Australia
Commodities Iron Ore

Executive Summary

This technical report outlines the recovery methods and processing capacity proposals for the Wonmunna Iron Ore Mine. The current operational setup utilizes a modular crushing and screening facility designed to process up to 5 million tonnes per annum (Mtpa) over an 8-year mine life. The process involves crushing and screening ore to a minus 8mm product size using a mobile dry processing plant.

A mining proposal seeks approval to increase processing capacity from 5 Mtpa to a maximum of 10 Mtpa. This expansion is intended to be achieved through mining multiple pit stages concurrently and enhancing the Ore Handling Plant’s crushing and screening capacity. The project includes the installation of a lump re-screening facility within the approved footprint.

The estimated commencement for the expansion was April/May 2021, with a completion date of 2025. The potential maximum tonnes of material mined and processed is up to 30 Mtpa, with a Life of Mine (LOM) extending to 2028. The facility remains a modular ore handling plant focusing on dry crushing, screening, and stockpiling of ore.

Website: https://www.voxroyalty.com/wonmunna

Report Date: 2022

Region: Western Australia

Project Status:

Commodity: Iron Ore

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics

Scroll to Top