Executive Summary
This NI 43-101 Technical Report outlines the mineral resources of the Duncan Lake Iron Project as of October 2012. The report details the proposed recovery methods based on test work conducted at SGS Lakefield. The project is currently in the development phase, with the finalized flowsheet intended for inclusion in a Preliminary Economical Assessment report.
The proposed recovery method involves a standard SAG mill-Ball mill configuration for the grinding circuit. The target grind size is specified as a P95 of 44 microns. Following grinding, the magnetite will be recovered using multiple stages of Low Intensity Magnetic Separators (LIMS).
Test work is ongoing, and the developed flowsheet will be presented in the Preliminary Economical Assessment report. This document serves as the foundational technical report for the mineral resources of the project at this stage of development.
Website: https://centuryglobal.ca/projects/duncan-lake/
Report Date: October 2012
Region:
Project Status: Development
Commodity: Iron
Throughput:
Mine Life:
Mine Type:
Ore type: