- Location: Tomingley Gold Project (TGO) & Tomingley Gold Extension Project (TGEP), New South Wales, Australia.
- Operators: Alkane Resources Ltd (ASX: ALK) and Mandalay Resources Corporation (TSX: MND).
- Processing Flow: Ore is trucked to the TGO plant, featuring a crushing circuit → single-stage milling → hybrid CIL circuit with leach/adsorption tanks.
- Gold Recovery: 87% metallurgical recovery via carbon adsorption, electrowinning, and smelting in an on-site gold room.
- Tailings Management: Thickened tailings stored in a paddock-type facility; capacity expandable to 10.5Mt.
- 2024 Upgrade: Added flotation circuit for refractory ore (rougher flotation + IsaMILL™ grinding) to process sulfide-associated gold.
- Throughput: Current tailings facility supports operations until mid-2027; dam height expansion planned.
- Key Equipment: Rougher flotation cells, thickener, IsaMILL™, and reagent systems for enhanced recovery.