Gold Processing Circuit at Tomingley & Peak Hill: Crushing, Flotation & CIL

  • Location: Tomingley Gold Project (TGO) & Tomingley Gold Extension Project (TGEP), New South Wales, Australia.
  • Operators: Alkane Resources Ltd (ASX: ALK) and Mandalay Resources Corporation (TSX: MND).
  • Processing Flow: Ore is trucked to the TGO plant, featuring a crushing circuit → single-stage milling → hybrid CIL circuit with leach/adsorption tanks.
  • Gold Recovery: 87% metallurgical recovery via carbon adsorption, electrowinning, and smelting in an on-site gold room.
  • Tailings Management: Thickened tailings stored in a paddock-type facility; capacity expandable to 10.5Mt.
  • 2024 Upgrade: Added flotation circuit for refractory ore (rougher flotation + IsaMILL™ grinding) to process sulfide-associated gold.
  • Throughput: Current tailings facility supports operations until mid-2027; dam height expansion planned.
  • Key Equipment: Rougher flotation cells, thickener, IsaMILL™, and reagent systems for enhanced recovery.