| Company | Vox Royalty Corp |
| Mine | Janet Ivy |
| Date | 2021 |
| Region | Northern Territory, Australia |
| Commodities | Gold |
Executive Summary
This NI 43-101 Technical Report covers the Janet Ivy Gold Mine project, prepared by Kangari Consulting LLC for Vox Royalty Corp. The report details metallurgical recovery criteria for the Fort Scott Mineral Reserve Estimate and outlines a proposed Heap Leach operation for the Binduli North Project.
The Paddington processing facility, operated by Norton Gold Fields, utilizes conventional carbon in pulp technology. In 2014, it achieved an annual throughput of 3.72 Mtpa with an average feed grade of 1.67 g/t and average recovery of 88.8%. Fort Scott ore is delivered via road trains to Paddington and blended to achieve a recovery factor of 94%.
Additionally, a December 2020 study by Talis Consultants proposes a Heap Leach operation for Binduli North. This involves on-site crushing, heap leaching, adsorption, elution, electrowinning, and smelting. The quantities reported for Binduli North are termed a Mineral Resource as the study level did not support a Reserve Statement.
Website: https://www.voxroyalty.com/janet-ivy
Report Date: 2021
Region: Northern Territory, Australia
Project Status:
Commodity: Gold
Throughput:
Mine Life:
Mine Type:
Ore type:

