| Company | Arian Silver Corporation |
| Date | 2012 |
| Region | Zacatecas, Mexico |
| Commodities | Silver, Lead, Zinc |
Executive Summary
This technical report update outlines the recovery methods currently employed and planned for the Arian property. Currently, the project utilizes a toll mill facility located 50km away at Juan Reyes. This twin stream flotation plant is rated for 500 tpd and currently produces a single Pb-Ag concentrate, with zinc concentrate being excluded due to penalties. The current recovery rates are estimated between 65-68% and are undergoing fine-tuning.
Arian Silver Corporation has proposed a plan to construct a custom-built processing plant on-site. This plan involves relocating, refurbishing, and reassembling equipment from a second-hand plant previously used at San José. The scoping study for this new facility estimates significantly improved recovery rates of 80.16% for Silver, 86.5% for Lead, and 52.5% for Zinc, pending final process test work.
Processing Methods
- Current: Primary crusher, Ball mill, Flotation, Filter presses.
- Proposed: Custom-built plant with second-hand equipment.
Website: https://ca.finance.yahoo.com/quote/I3A.SG/
Report Date: 2012
Region: Zacatecas, Mexico
Project Status:
Commodity: Silver, Lead, Zinc
Throughput:
Mine Life:
Mine Type:
Ore type: