Bayan Khundii Gold Project — Feasibility Study Update
This Feasibility Study Update for the Bayan Khundii Gold Project presents a Class 2 estimate based on a complete engineered design. The process plant is designed to handle an annual throughput of 650,000 tonnes per annum (tpa), processing ore with an average gold head grade of 3.98 g/t. The design incorporates Mongolian structural standards alongside Eurocode guidelines to ensure comprehensive engineering compliance. The study confirms that the ore is amenable to conventional cyanide leaching with recoveries averaging in the low to mid 90s, specifically targeting a 92.7% recovery rate over the life of mine.
Bayan Khundii Gold Project — Feasibility Study Update Read Post »


