Charley Creek Rare Earth Project — 2013 Technical Report

The Charley Creek Rare Earth Project, proposed by Pancontinental Uranium Corporation, outlines a comprehensive recovery method for an alluvial deposit carrying heavy minerals. The mine site processing involves two wet plants and one dry plant designed to produce a REO concentrate grading around 40% TREOs. The wet plant utilizes scrubbing, hydrocycloning, and spiral gravity separation to upgrade the concentrate, while the dry plant employs electrostatic and magnetic separation to further refine the product. By-products include ilmenite and zircon concentrates.

Charley Creek Rare Earth Project — 2013 Technical Report Read Post »

Riotinto — 2023 Technical Report

The Riotinto concentrator processes copper sulfide mineralized material using conventional froth flotation to produce a copper concentrate. The plant employs a combination of existing equipment associated with historical operations as well as expanded and upgraded facilities. Since refurbishment and re-commissioning in June 2015, the process was upgraded and successfully expanded to 9.5 Mtpa and is currently operating at above 15 Mtpa.

Riotinto — 2023 Technical Report Read Post »

Tugaske Project — 2019 Technical Report

This technical report outlines the recovery methods for the Tugaske Project located in Saskatchewan, Canada. The process plant is designed to produce 250,000 tonnes per year of saleable Muriate of Potash (MOP). The operation utilizes solution mining techniques, involving the injection of heated brine into underground sylvinite ore deposits to selectively dissolve potassium chloride (KCl). The resulting production brine is processed through a multi-stage crystallization circuit to recover KCl crystals.

Tugaske Project — 2019 Technical Report Read Post »

CPP — North Dry Ridge Recovery Methods

This section outlines forward-looking information regarding handling and processing methods, plant design, and equipment selection for the CPP project. It details the current Wash Plant flowsheet performance and its suitability for future extraction ores, specifically North Dry Ridge and Husky1. The text reviews future beneficiation plant flowsheets, including modifications to process high MgO ores efficiently.

CPP — North Dry Ridge Recovery Methods Read Post »

Figure 17-1: Simplified Amerigo Process Flowsheet

Minera Valle Central Operation — 2022 Technical Report

The Minera Valle Central (MVC) operation processes fresh tailings from Codelco’s El Teniente and historic tailings from the Cauquenes impoundment. The plant utilizes hydrocyclones for classification, ball mills for grinding, and a flotation circuit including conventional cells, columns, and cascade skim flotation to produce copper and molybdenum concentrates. The bulk concentrate is reground and cleaned followed by selective flotation for molybdenum separation. Final tailings from both circuits report to thickening before final discharge to the El Teniente tailings channel. The target fresh tailings concentrator throughput is 140,000 TPD, while Cauquenes has a target throughput of 40,000 TPD.

Minera Valle Central Operation — 2022 Technical Report Read Post »

Lawyers Gold-Silver Project — Preliminary Economic Assessment

This Preliminary Economic Assessment (PEA) outlines the processing plant design for the Lawyers Gold-Silver Project. The facility is designed as a 10,600 t/d cyanide leach plant utilizing Merrill Crowe recovery technology for precious metals. The plant is tailored for a deposit with a high silver/gold ratio, employing zinc dust precipitation rather than carbon adsorption to recover gold from solution.

Lawyers Gold-Silver Project — Preliminary Economic Assessment Read Post »

Process diagram from technical-report PDF page 286

Doropo Gold Project — 2023 Pre-feasibility Study

This National Instrument 43-101 Technical Report presents the Pre-feasibility Study for the Doropo Gold Project in West Africa. The proposed process plant design is based on a robust metallurgical flowsheet designed for optimum recovery with minimum operating costs. The flowsheet utilizes unit operations that are well proven in industry, with equipment selection criteria focusing on suitability for duty, projected mine life, reliability, and ease of maintenance. The plant layout is designed to provide ease of access for operating and maintenance requirements while maintaining a compact footprint to minimize construction costs.

Doropo Gold Project — 2023 Pre-feasibility Study Read Post »

Preliminary Economic Assessment – El Cubo

This Preliminary Economic Assessment outlines the processing plan for the El Cubo project, managed by VanGold. The report details the utilization of the existing El Cubo Mill, which is designed to operate at a throughput of 750 tonnes per day. The plant will process ore sourced from a combination of the El Cubo underground mine and the El Pinguico above-ground and underground stockpiles. The objective is to produce approximately 12 tonnes of gold-silver concentrate daily.

Preliminary Economic Assessment – El Cubo Read Post »

Falchani Lithium Project — Process Design Report

This technical report outlines the process design for the Falchani Lithium Project, which consists of an open pit mine and an associated processing facility. The design is based on achieving a peak milled tonnage of 6 Mt/y over three phases, with a total mine life of 43 years. The Base Case process plant includes mineralized material handling, crushing, grinding, acid leaching, neutralization, softening, evaporation, ion exchange, and lithium carbonate precipitation. The Alternate Case adds specific steps for Potassium Sulfate (SOP) and Mixed Sulfate recovery.

Falchani Lithium Project — Process Design Report Read Post »