admin

Figure 1-2: Simplified Process Flow Diagram

Colomac Gold Project — 2023 Technical Report

This NI 43-101 Technical Report and Preliminary Economic Assessment outlines the proposed process design for the Colomac Gold Project. The flowsheet was selected based on preliminary metallurgical testwork and economic modelling, utilizing standard technologies for gold processing. The design includes conventional crushing, grinding, leaching, carbon adsorption, desorption, electrowinning, and refining circuits, along with cyanide destruction and tailings dewatering.

Colomac Gold Project — 2023 Technical Report Read Post »

Process diagram from technical-report PDF page 286

Feasibility Study of the Southwest Pit — 2024 Technical Report

BlackRock Metals has completed a Feasibility Study for the Southwest Pit project located in Chibougamau, Québec. The study outlines a comprehensive plan to extract Vanadium Titanium Magnetite (VTM) ore from an open pit mine. The proposed operation targets an average annual throughput of 3.13 million tonnes per year (Mtpy), with a magnetite concentrate production target of 0.865 Mtpy. The project is currently in the development phase, supported by bench-scale and pilot-scale testwork conducted at COREM and SGS.

Feasibility Study of the Southwest Pit — 2024 Technical Report Read Post »

Tabakoto Mining Operations Report No. 217

This technical report details the processing plant operations and expansion plans for the Tabakoto Mine operated by Avion Gold Corporation. The existing facility treats approximately 750,000 tonnes per year of ore using a circuit comprising jaw and cone crushers, a ball mill, gravity concentration, and carbon-in-leach (CIL) tanks. The plant currently produces gold bullion with historical recoveries averaging around 96.5% for specific ore types.

Tabakoto Mining Operations Report No. 217 Read Post »

Ollachea Gold Project — 2021 Technical Report

The Ollachea Gold Project Technical Report details a staged construction plan for the treatment plant, initiating with a 1,500 tonnes per day (tpd) capacity in Stage 1 and expanding to 3,000 tpd by Year 4. The processing circuit integrates gravity concentration with carbon-in-leach (CIL) technology to recover gold and silver. Mineralized material is crushed to a P80 of 8 mm and ground to 75 microns in a ball mill. High-grade gravity concentrates are upgraded on shaking tables for direct smelting, while lower-grade concentrates and tailings are processed through a CIL circuit.

Ollachea Gold Project — 2021 Technical Report Read Post »

Songjiagou Gold Project — 2013 Technical Report

The Songjiagou Gold Project, operated by Majestic Gold Corp., is an active mining operation located in the Muping District of China. The project features a combined processing capacity of 7,400 tpd across three distinct plants, with two plants commissioned in 2006 and a third added in May 2011. The mine utilizes both underground and open pit mining methods, with ore from the underground mine processed in the 200 tpd plant and open pit inventory handled by the larger 1,200 tpd and 6,000 tpd facilities.

Songjiagou Gold Project — 2013 Technical Report Read Post »

Briggs Mine — Recovery Methods Report

The Briggs mine has processed over 30 million tons of ore to date, resulting in the production of in excess of 640,000 ounces of gold. The operation utilizes a conventional crush and heap leach process for gold recovery. The facility includes a refinery for the production of gold/silver doré and maintains an assay/metallurgical lab for quality control.

Briggs Mine — Recovery Methods Report Read Post »

East Kemptville Project — Technical Report

The metallurgical process for the East Kemptville Project focuses on the recovery of a tin concentrate with a target grade of 55% Sn. Based on testwork described in Section 13.0, the flowsheet was developed to be simple and cost-effective, prioritizing tin recovery over maximizing other metal recoveries. A small portion of copper, zinc, iron, and indium will be collected into a sulphide concentrate and disposed of in the tailings facility unless a buyer is found.

East Kemptville Project — Technical Report Read Post »

FIGURE 17.1 Frances Creek Barite Production Flow Diagram

Frances Creek Prospect Technical Report

This section outlines the proposed recovery methods for the Frances Creek Prospect, which is currently in the exploration stage. While NI 43-101 does not require recovery details for exploration projects, Voyageur has developed a conceptual milling plan to benefit potential investors. The plan involves on-site crushing and gravity separation of barite, followed by off-site milling and acid washing to produce high-purity barite powder.

Frances Creek Prospect Technical Report Read Post »

Huguenot Coal Project — Technical Report

The Huguenot Coal Project Technical Report outlines the recovery methods for a Preliminary Economic Assessment (PEA) of the Huguenot Coal Project located in the Liard Mining Division of British Columbia, Canada. The proposed Coal Handling and Preparation Plant (CHPP) is designed with a capacity to process approximately 4.0 Mt/y of Run-of-Mine (ROM) coal. A key design objective is to achieve a product total moisture content of 7.5% or less, prioritizing mechanical dewatering methods over traditional thermal drying to manage capital and operating costs while adhering to environmental constraints.

Huguenot Coal Project — Technical Report Read Post »

Process diagram from technical-report PDF page 286

Bayan Khundii Gold Project — Feasibility Study Update

This Feasibility Study Update for the Bayan Khundii Gold Project presents a Class 2 estimate based on a complete engineered design. The process plant is designed to handle an annual throughput of 650,000 tonnes per annum (tpa), processing ore with an average gold head grade of 3.98 g/t. The design incorporates Mongolian structural standards alongside Eurocode guidelines to ensure comprehensive engineering compliance. The study confirms that the ore is amenable to conventional cyanide leaching with recoveries averaging in the low to mid 90s, specifically targeting a 92.7% recovery rate over the life of mine.

Bayan Khundii Gold Project — Feasibility Study Update Read Post »