Touro Copper Project — 2018 Technical Report
This report presents the proposed processing flowsheet, design criteria, and testwork results for a two-phase copper concentrator at the Touro
Touro Copper Project — 2018 Technical Report Read Post »
This report presents the proposed processing flowsheet, design criteria, and testwork results for a two-phase copper concentrator at the Touro
Touro Copper Project — 2018 Technical Report Read Post »
This technical report reproduces processing sections from a 2011 preliminary economic assessment, which has not been updated to show the
Garrcon Project — 2014 Technical Report Read Post »
This report details the proposed processing design for restarting the Copper Rand mill to treat blended mineralized material from three
Chibougamau Hub-and-Spoke Complex — 2022 Technical Report Read Post »
This technical report presents the proposed modifications to the existing Santander concentrator to process mineralised material from the Santander Pipe
Santander Pipe Deposit — 2023 Technical Report Read Post »
The Lake Giles Iron Project processing route is designed to produce 3.0 dMtpa of magnetite concentrate from approximately 10 Mtpa
Lake Giles Iron Project — NI 43-101 Technical Report Read Post »
The process plant design for the Loma Larga Project is based on testwork, vendor data, and design criteria to produce
Loma Larga Project — 2025 Feasibility Study Update Read Post »
This technical report presents a preliminary economic assessment for the proposed Goldfields gold project in northern Saskatchewan, based on whole-mineralized-material
Goldfields Gold Project — 2025 Technical Report Read Post »
This technical report presents the mineral processing operations, metallurgical testwork, and resource estimates for the Paroo Station lead carbonate mine
Paroo Station Lead Carbonate Mine — 2015 Technical Report Read Post »
This report describes proposed processing routes for the Nkout iron ore project based on a May 2012 Preliminary Economic Assessment
Nkout MRE – Main Report (September 2013) Read Post »
Dundee Precious Metals' 2021 prefeasibility study for the Timok gold project near Žagubica, Serbia, stacks 19.2 Mt over an eight-year