Los Ricos South Feasibility Study Designs a 2,000 t/d Single-Stage SAG, Leach-CCD and Merrill-Crowe Plant With SART Copper Recovery

GoGold Resources Inc. has released an Updated Pre-Feasibility Study (PEA) for the Los Ricos South Project located in Mexico. The project targets Gold, Silver, and Copper commodities with a mine life of 12 years. The process plant is designed for a nominal throughput of 1,750 tpd in Years 1-3, expanding to 4,000 tpd in Years 4-12. The ore is characterized by average grades of 1.18 g/t Au, 125 g/t Ag, and 0.09% Cu.

Los Ricos South Feasibility Study Designs a 2,000 t/d Single-Stage SAG, Leach-CCD and Merrill-Crowe Plant With SART Copper Recovery Read Post »

Kuriskova Uranium Project — 2012 Technical Report

The Kuriskova Uranium Project 2012 Technical Report outlines the design of an Underground Processing Facility (UPF) capable of processing 600 tonnes per day of uranium-bearing ores. The facility is designed for the Preliminary Feasibility Study (PFS) stage, indicating a development status. The primary objective is the extraction of uranium and molybdenum using a carbonate leach process combined with pressure oxidation. The process plant is designed to produce a uranium peroxide yellowcake as well as a molybdenum sulfide concentrate.

Kuriskova Uranium Project — 2012 Technical Report Read Post »

Brule Project — Technical Report

This report details the recovery methods for the Brule Project, focusing on the Willow Creek Coal Handling and Preparation Plant (CHPP). The plant utilizes standard coal washing methods including heavy media cyclones, water only cyclones, spiral circuits, and flotation to reduce coal ash content to 8% on an air-dried basis. Designed by Taggart Global LLC, the plant has a capacity of 660 tonnes per hour and is intended to accommodate ROM tonnage from both Willow Creek and Brule mines. The target product specifications include a moisture content of 8.5% max, ash of 8.0 ± 0.5%, and sulfur less than 0.55%.

Brule Project — Technical Report Read Post »

Brucejack 2019 Report Plans to Lift the SABC, Gravity and Flotation Mill From 2,700 to 3,800 t/d After Two Years of 97% Gold Recovery

This Feasibility Study and Technical Report Update outlines the proposed processing plant for the Brucejack Project located in Stewart, British Columbia. The project is an underground mine targeting gold and silver mineralization hosted in quartz-carbonate-adularia veins and stockwork zones. The proposed concentrator is designed to process ore at a nominal rate of 2,700 tonnes per day with an equipment availability of 92%. The plant will produce gold-silver doré from gravity concentration and smelting on-site, as well as a gold-silver bearing flotation concentrate for off-site smelting.

Brucejack 2019 Report Plans to Lift the SABC, Gravity and Flotation Mill From 2,700 to 3,800 t/d After Two Years of 97% Gold Recovery Read Post »