admin

Sevier Playa Potash Project — 2018 Technical Report

This NI 43-101 Technical Report summarizes the Feasibility Study for the Sevier Playa Potash Project located in Millard County, Utah. The project focuses on the production of Sulphate of Potash (SOP) from saline brine extracted from playa ponds. The process design is based on metallurgical testwork and utilizes solar evaporation to concentrate potassium-bearing minerals before wet and dry processing.

Sevier Playa Potash Project — 2018 Technical Report Read Post »

FIGURE 17-1 OVERALL PROCESS FLOWSHEET PHASE 1

Eagle Mountain Gold Project — 2024 Preliminary Economic Assessment

This Preliminary Economic Assessment (PEA) outlines the processing plant design for the Eagle Mountain Gold Project in Guyana, operated by Goldsource Mines Inc. The project is designed with a 15-year mine life, split into two phases: Phase 1 (4.5 years) focusing on saprolite mill feed, and Phase 2 (10.5 years) incorporating fresh mill feed. The plant is designed for a throughput of 5,000 tonnes per day (226 t/h).

Eagle Mountain Gold Project — 2024 Preliminary Economic Assessment Read Post »

The simplified flowsheet for processing material from the Project is shown in Figure 17.1.

Golden Chest Project — 2017 Technical Report

This technical report details the processing operations for the Golden Chest Project located in Idaho, USA. Mineralized material is transported to the New Jersey Mill in Kellogg, Idaho, where it undergoes crushing, grinding, gravity concentration, and flotation to produce marketable concentrates. The mill processes both unoxidized sulphide material from underground operations and partially oxidized material from open pit mining.

Golden Chest Project — 2017 Technical Report Read Post »

Scroll to Top