Matupá Gold Project — 2022 Technical Report
This chapter details the recovery methods and process plant design for the Matupá Gold Project. The selected metallurgical process flow sheet is based on a robust route extensively adopted in the gold industry, featuring a primary crushing circuit followed by a single-stage SAG mill in a closed configuration with hydrocyclones. The process was optimized through third campaign testing, which confirmed that a gravity concentration and leaching process alternative offered higher metallurgical performance compared to direct leaching. The design criteria include a nominal processing rate of 3,562 tpd with specific availability targets for crushing, grinding, and filtration circuits.
Matupá Gold Project — 2022 Technical Report Read Post »



