admin

Figure 16-1. Generalized mining method flowsheet for the oxide stockpiles (Zandonai, 2020).

Don Mario Property — 2022 Technical Report

This NI 43-101 Technical Report details the recovery methods for the Oxide Stockpiles Project at the Don Mario Property in Bolivia. The project focuses on processing existing mineral from the Don Mario Stockpiles using a sulphidation circuit to maximize value. The proposed processing plant includes a comprehensive flowsheet designed to recover copper, gold, and silver from oxide ore.

Don Mario Property — 2022 Technical Report Read Post »

Perron Feasibility Study Sends 1,100 t/d of 12 g/t Gold Ore to a Toll Mill for 97.5% Recovery

This NI 43-101 Technical Report presents a Preliminary Economic Assessment (PEA) for the Perron Project located in Quebec, Canada, prepared by Bumigeme for Amex Exploration. The project outlines a two-phase development strategy, beginning with Phase 1 toll milling of 1,000 tonnes per day (tpd) and transitioning to Phase 2 in Year 5 with an on-site processing plant operating at 2,000 tpd. The ore is sourced from a hybrid mining method comprising 88% underground mining and 12% open pit mining.

Perron Feasibility Study Sends 1,100 t/d of 12 g/t Gold Ore to a Toll Mill for 97.5% Recovery Read Post »

Tolillar Project — 2023 PEA Update

This NI 43-101 Technical Report Update on Preliminary Economic Assessment for the Tolillar Project, dated August 10, 2023, provides a detailed overview of the recovery methods employed in the project’s processing plan. The document focuses heavily on the hydrometallurgical processes required to extract lithium from the ore, specifically detailing the chemical reactions involved in impurity removal and lithium recovery.

Tolillar Project — 2023 PEA Update Read Post »

Gold Springs Project — 2020 Technical Report

The Gold Springs Project is a Preliminary Economic Assessment (PEA) for an open-pit mining operation utilizing a conventional heap leach system. The project is designed for 24-hour, 365-day operation with a throughput of approximately 15,000 tonnes per day. The ore will be processed via a combination of run-of-mine (ROM) and crushed material, with a cross-over grade determining the treatment path.

Gold Springs Project — 2020 Technical Report Read Post »

Figure 13-14: Process Flow Diagram for Continuous Rougher (a) and Rougher/Cleaner (b) MPP

Turmalina Mining Complex — 2024 Technical Report

The Turmalina Mining Complex, operated by Jaguar Mining Inc., is an operating underground gold mine with a processing plant capable of handling ore from the Turmalina mine and Faina deposit. In 2021, the plant processed approximately 409,700 tonnes at an average grade of 3.12 g/t Au with an overall recovery of 88.6%. The current mine plan targets a peak production rate of 600,000 tonnes per year (1,644 tpd) in 2025 and 2026, utilizing a nominal processing capacity of 2,000 tpd.

Turmalina Mining Complex — 2024 Technical Report Read Post »

Borborema Gold Project — 2026 Technical Report Summary

The Borborema Gold Project Technical Report outlines the design of a processing plant tailored for Biotite-Garnet-Schist ore with a nominal head grade of 1.22 g/t Au. The facility is designed for an annual throughput of 2 million tonnes per year (Mtpy) via an open-pit mining method. The process flow sheet integrates gravity concentration followed by carbon-in-leach (CIL) cyanidation to achieve a global gold recovery of 92.1%. The design incorporates best practices from the gold industry, utilizing a single-stage semi-autogenous grinding (SSSAG) circuit closed with hydrocyclones to produce a P80 of 0.105 mm.

Borborema Gold Project — 2026 Technical Report Summary Read Post »

Standard Lithium Smackover Commercial Lithium Extraction Plant — Technical Report

The Standard Lithium Commercial Lithium Extraction Plant is a development-stage project located in the Smackover Formation, Arkansas. The facility is designed to process Smackover brine supplied by LANXESS South Plant to extract lithium using Direct Lithium Extraction (DLE) technology. The process involves brine pre-treatment, Lithium Selective Sorption (LSS), purification, concentration, and conversion to battery-quality lithium carbonate.

Standard Lithium Smackover Commercial Lithium Extraction Plant — Technical Report Read Post »

Scroll to Top