Basin East — 2023 Technical Report

Company SRK Consulting
Date 2023

Executive Summary

This report provides a Mineral Resource Estimate (MRE) for the Basin East project as of February 2023. The document serves as a technical disclosure for the project’s current geological status.

The Qualified Person notes that no Mineral Reserves are reported for the project, and a formal Pre-Feasibility Study (PFS) or Feasibility Study (FS) has not yet been conducted. Consequently, the Basin East project is not classified as an advanced property under NI 43-101 standards, and no recovery methods or processing flowsheets are detailed within this report.

Website: https://www.braddaheadltd.com/projects/basin

Report Date: 2023

Region: 

Project Status:

Commodity: 

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics

Scroll to Top