Bongará Zinc Project — 2014 Technical Report

Company Solitario
Date 2014-06-18

Executive Summary

This document is a snippet from the Bongará Zinc Project NI 43-101 Technical Report dated June 18, 2014. The excerpt includes the Table of Contents and Section 15 (Recovery Methods), which explicitly states there is nothing to report. Sections 16 (Project Infrastructure) and 17 (Market Studies) are listed but their content is not included in this text. The report focuses on the Bongará Zinc Project.

Sections

  • 15 Recovery Methods (Item 17)
  • 16 Project Infrastructure (Item 18)
  • 17 Market Studies and Contracts (Item 19)

Website: https://solitarioxr.com/florida-canyon-zinc-project-peru/

Report Date: 2014-06-18

Region: 

Project Status:

Commodity: 

Throughput: 

Mine Life: 

Mine Type: 

Ore type:

Technical report and processing history

The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.

Bongará Property — 2008 Technical Report

Bongará Property — 2008 Technical Report

Company: Cementos (Centura SAB)
Property: Bongará Zinc Project
Location: Bongará, Peru
Date: 2008

Executive Summary

The Bongará Zinc Project, operated by Cementos (with investment from Centura SAB), reached commercial production at the beginning of 2008 following the completion of the processing plant in 2007. The company planned to invest approximately US$50 million in the Bongará Property to produce in the range of 22,000 tonnes per annum of zinc metal for at least ten years. The operation processes oxide ore, which is trucked to the kiln facility in Chiclayo for processing to produce calcines. The calcines are then sold to zinc refineries for final metal production. The text indicates uncertainty regarding the specific grade and tonnage of the ore, as well as the efficiency of zinc recovery.

Key Details

  • Commodity: Zinc
  • Production Rate: ~22,000 t/a zinc metal
  • Mine Life: Minimum 10 years
  • Status: Operating (commercial production achieved early 2008)
  • Ore Type: Oxide
  • Processing: Roasting/kiln processing to produce calcines

References

  • Centura SAB, 2005a

Website: https://www.99acres.com/property-in-bongara-guwahati-ffid

Report Date: 

Region: 

Project Status:

Commodity: 

Throughput: 

Mine Life: 

Mine Type: 

Ore type:

Mineral processing basics

Scroll to Top