Executive Summary

The 2025 NI 43-101 Technical Report for the Cassiar Gold Property, prepared for Cassiar Gold Corp., focuses on the Taurus deposit within the northern British Columbia region. The report updates the mineral resource estimate effective June 8, 2025, identifying a total of 2,330,000 ounces of gold across indicated and inferred categories. The deposit is characterized as a mafic volcanic-hosted orogenic gold system with mineralization occurring in vein and shear networks.

The report outlines significant infrastructure advantages, including road access, grid power, and a permanent camp. However, the project remains in the exploration phase, with the author recommending an aggressive drilling campaign (Phase 1) to upgrade resource confidence and expand the inventory at Taurus and outlying prospects. Metallurgical test work is also recommended to establish processing parameters, as no specific processing plant is currently defined.

Recommendations include approximately 20,000m of drilling in Phase 1 and follow-up work in Phase 2 to move the deposit closer to a Preliminary Economic Assessment. The property faces normal exploration risks but benefits from a long history and established land package.

Website: https://cassiargold.com/

Report Date: 2025-06-08

Region: Northern British Columbia, Canada

Project Status: Exploration

Commodity: Gold

Throughput: 

Mine Life: 

Mine Type: Open Pit (Proposed)

Ore type:

Technical report and processing history

The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.

Cassiar Gold Property — 2022 Technical Report

Cassiar Gold Property — 2022 Technical Report

Company: Cassiar Gold Corp.
Date: April 28, 2022
Report Type: NI 43-101 Technical Report

Executive Summary

The Cassiar Gold Property is a gold exploration project located in northern British Columbia, Canada, within the Liard Mining Division. The property covers a large land package of approximately 59,000 hectares and hosts both high-grade and low-grade gold mineralization occurring along a 15 km long trend. The mineralization is hosted within mafic volcanics and is typically associated with regional and property-scale thrust faults, dextral faults, and zones of listwanite. The property has good infrastructure including road access, grid power, and a permanent camp in good operating condition.

The author estimated a mineral resource on the Taurus deposit, which comprises 23 “vein” domains and a grade shell domain. The inferred mineral resource is 37,900,000 tonnes at 1.14 g/t Au containing 1,390,000 ounces of gold at a 0.50 g/t Au cut-off. The resource was estimated using a US$1,800/oz Au metal price with process recoveries of 92%. The property has a considerable history of exploration and past production, with historical mines including the Taurus Mine, Table Mountain operations, and Erickson Mine.

The report recommends an aggressive Phase 1 drilling campaign of approximately 20,000m at Taurus and Cassiar South vein systems to validate historically drilled areas and expand the resource laterally and at depth. Phase 2 recommendations include advanced geological modeling and metallurgical testwork. Total recommended exploration expenditure is approximately $9.1 million CAD.

Property Details

  • Location: Northern British Columbia, Canada
  • Mining Division: Liard Mining Division
  • Land Package: ~59,000 hectares
  • Commodity: Gold
  • Deposit Type: Orogenic gold, quartz-carbonate vein
  • Status: Exploration
  • Target: Open pit (Taurus) and underground (vein systems)

Mineral Resources

Deposit Category Tonnes Au (g/t) Au (oz) Cut-off
Taurus Inferred 37,900,000 1.14 1,390,000 0.50 g/t Au

Key Recommendations

  1. Phase 1: 20,000m drilling program ($8.675M CAD)
  2. Phase 2: 3D modeling and metallurgical testwork ($450,000 CAD)
  3. Additional: Historical records investigation, QA/QC program refinement, lithogeochemical classification

Qualified Persons

  • Scot Zelligan, P.Geo. (Sections 1-8, 11-27, 10.1)
  • James G. Moors, P.Geo. (Sections 9, 10, 12.4)
  • Chantal Jolette, P.Geo. (Sub-sections 11.4, 12.2)

Website: https://cassiargold.com/

Report Date: 

Region: 

Project Status:

Commodity: 

Throughput: 

Mine Life: 

Mine Type: 

Ore type:

Mineral processing basics

Scroll to Top