Norasa DFS Designs an 11.2 Mt/a Acid Leach Uranium Plant With Belt Filtration, IX and SX for 91.3% Recovery
Forsys Metals' March 2015 definitive feasibility study for the Norasa uranium project in Namibia sizes a single SAG mill train
Forsys Metals' March 2015 definitive feasibility study for the Norasa uranium project in Namibia sizes a single SAG mill train
The May 2019 exploration-level report on Pure Nickel's Elmore County property looks at a custom mill, the nearby Golden Eagle
Atlantic Gold's 2019 technical report for its Moose River operations in Nova Scotia describes the operating Touquoy plant and a
Mineral processing for the Fire Creek Project relies on third-party milling at the Midas Mine, with metallurgical testwork completed between
Fire Creek Project — 2018 Technical Report Read Post »
The Thompson Creek concentrator, operating since 1983, will treat remaining ore using a conventional molybdenum flowsheet with proposed refurbishment and
Thompson Creek Molybdenum Mine — 2024 Technical Report Read Post »
Rose Lithium Tantalum Project — 2023 Technical Report Company Critical Elements Lithium Corporation Date 2023 Region Quebec, Canada Commodities Lithium,
Rose Lithium Tantalum Project — 2023 Technical Report Read Post »
Bunker Hill Mine — 2022 Technical Report Company Bunker Hill Mining Corp. Date 2022-08-29 Region Coeur d’Alene Mining District, Shoshone
Bunker Hill Mine — 2022 Technical Report Read Post »
This report describes the proposed alkaline carbonate leach processing route for the Ivana uranium-vanadium deposit, including leach feed concentrate preparation
The 2023 feasibility study update for the Lac Knife graphite project describes a concentrator designed to produce 50,000 dry t/y
Lac Knife Graphite Project — 2023 Feasibility Study Update Read Post »
The updated preliminary economic assessment drops Merrill-Crowe because of low silver recovery, and weighs a jaw crusher against hauling ore