Wonmunna Iron Ore Mine — 2022 Technical Report
Wonmunna Iron Ore Mine — 2022 Technical Report Company Vox Royalty Corp. Date 2022 Region Western Australia Commodities Iron Ore
Wonmunna Iron Ore Mine — 2022 Technical Report Read Post »
Wonmunna Iron Ore Mine — 2022 Technical Report Company Vox Royalty Corp. Date 2022 Region Western Australia Commodities Iron Ore
Wonmunna Iron Ore Mine — 2022 Technical Report Read Post »
This report presents preliminary process design criteria and recovery methods for uranium, with conceptual considerations for lithium and potassium, supporting
Pan American Silver's technical report on the Brazilian underground mine, effective June 30, 2023, describes three-stage crushing, grinding to 80%
Zarechnoye Uranium Mine — 2014 Technical Report Company Uranium One Inc. Date 2014 Commodities Uranium Executive Summary This technical report
Zarechnoye Uranium Mine — 2014 Technical Report Read Post »
Liberty Gold's September 2026 feasibility study keeps the run-of-mine cyanide heap leach from the 2024 study but raises the stacking
The Ularring Hematite Project Option 2 processing route is designed to beneficiate Run of Mine ore by crushing, scrubbing, gravity
Ularring Hematite Project — 2012 Pre-Feasibility Study Read Post »
This NI 43-101 feasibility study update describes the proposed gold processing plant design for the Hardrock Project, based on extensive
Hardrock Project — 2021 Technical Report Read Post »
GoGold Resources Inc. has released an Updated Pre-Feasibility Study (PEA) for the Los Ricos South Project located in Mexico. The project targets Gold, Silver, and Copper commodities with a mine life of 12 years. The process plant is designed for a nominal throughput of 1,750 tpd in Years 1-3, expanding to 4,000 tpd in Years 4-12. The ore is characterized by average grades of 1.18 g/t Au, 125 g/t Ag, and 0.09% Cu.
The Kuriskova Uranium Project 2012 Technical Report outlines the design of an Underground Processing Facility (UPF) capable of processing 600 tonnes per day of uranium-bearing ores. The facility is designed for the Preliminary Feasibility Study (PFS) stage, indicating a development status. The primary objective is the extraction of uranium and molybdenum using a carbonate leach process combined with pressure oxidation. The process plant is designed to produce a uranium peroxide yellowcake as well as a molybdenum sulfide concentrate.
Kuriskova Uranium Project — 2012 Technical Report Read Post »
This report details the recovery methods for the Brule Project, focusing on the Willow Creek Coal Handling and Preparation Plant (CHPP). The plant utilizes standard coal washing methods including heavy media cyclones, water only cyclones, spiral circuits, and flotation to reduce coal ash content to 8% on an air-dried basis. Designed by Taggart Global LLC, the plant has a capacity of 660 tonnes per hour and is intended to accommodate ROM tonnage from both Willow Creek and Brule mines. The target product specifications include a moisture content of 8.5% max, ash of 8.0 ± 0.5%, and sulfur less than 0.55%.
Brule Project — Technical Report Read Post »