Brucejack 2019 Report Plans to Lift the SABC, Gravity and Flotation Mill From 2,700 to 3,800 t/d After Two Years of 97% Gold Recovery
This Feasibility Study and Technical Report Update outlines the proposed processing plant for the Brucejack Project located in Stewart, British Columbia. The project is an underground mine targeting gold and silver mineralization hosted in quartz-carbonate-adularia veins and stockwork zones. The proposed concentrator is designed to process ore at a nominal rate of 2,700 tonnes per day with an equipment availability of 92%. The plant will produce gold-silver doré from gravity concentration and smelting on-site, as well as a gold-silver bearing flotation concentrate for off-site smelting.






