Cortez Complex: Oxide and Refractory Ore Processing

Overview

The Cortez Complex in Nevada features multiple processing pathways for both oxide and refractory ores. The facility includes an oxide processing plant (Pipeline Mill), heap leach operations, and the capability to transport refractory ores to the Carlin Complex for specialized treatment through roasting or autoclaving processes.

Key Process Stages

  • Pipeline Mill (Oxide Processing): 16,330 t/d capacity plant with crushing, SAG/ball mill grinding, CIL circuit, carbon stripping, and doré production
  • Heap Leach Operations: Three double-lined pads processing ROM ore with CIC gold recovery
  • Refractory Ore Treatment: Transport to Carlin Complex for processing through:
    • Goldstrike Roaster (two-stage fluid bed roasters with CIL circuit)
    • Goldstrike Autoclave (pressure oxidation with RIL/CaTS process)
    • Gold Quarry Roaster (single-stage roasters with CIC/CIL circuits)
  • Gold Recovery: Common refinery for all circuits featuring Zadra elution, electrowinning, and doré production

Critical Data

Parameter Value
Pipeline Mill Throughput 16,330 t/d (4.9 Mt/a permitted)
Grind Size (CIL Circuit) 150 µm target
CIL Retention Time 36-48 hours
Refractory Ore Transport Limit 2.3 Mt/a
Power Requirement 12.5 MW total
Mill Power 3,200 kW per mill
Heap Leach Power 1,500 kW

Special Features

The Pipeline Mill features an innovative CIC circuit for grind thickener overflow solution recovery, capturing gold dissolved during grinding. The facility uses a zero-discharge tailings storage facility with comprehensive liner systems and solution recovery.

For refractory ores, the complex utilizes advanced processing methods including fluid bed roasting with sulfur supplementation when needed, and has demonstrated success with alternative autoclave/RIL processing for borderline refractory ores.

Technical report and processing history

The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.

Cortez Complex — 2022 Technical Report

Cortez Complex — 2022 Technical Report

Company Newmont
Mine Cortez Complex
Date 2022
Region Nevada
Commodities Gold

Executive Summary

This section of the NI 43-101 Technical Report details the recovery methods employed at the Cortez Complex in Nevada. The facility processes oxide ore through on-site oxide processing facilities, including the Pipeline Mill and heap leach pads, while refractory ore is transported to the Carlin Complex for advanced treatment. The Pipeline Mill is capable of handling up to 16,330 tonnes per day and is permitted for an annual throughput of 4.9 million tonnes. The process involves crushing, grinding, and carbon-in-leach (CIL) circuits for oxide ores, alongside heap leaching for low-grade material.

Refractory ores, characterized by a CNAA:FA ratio of less than 50% or a preg rob value greater than 40%, are shipped to the Carlin Complex facilities at Goldstrike or Gold Quarry. These facilities utilize fluid bed roasters followed by CIL circuits or autoclaves followed by resin-in-leach (RIL) circuits to treat the carbonaceous and sulfide refractory components. The report confirms that all process facilities are constructed and operational, suitable for the life-of-mine plan.

Water supply is managed through well fields, tailings storage facility reclaim, storm run-off, and pit dewatering, ensuring sufficient resources for the LOM plan. The processing infrastructure includes comprehensive refining capabilities, producing gold doré through electrowinning and induction furnaces. The integration of these diverse recovery methods allows for the efficient treatment of varying ore types within the complex.

Processing Overview

  • Crushing: Jaw crusher, Cone crusher
  • Milling: SAG mill, Ball mill
  • Leaching: Heap Leach, Carbon-in-Leach (CIL), Carbon-in-Column (CIC), Resin-in-Leach (RIL)
  • Refractory Treatment: Fluid Bed Roaster, Autoclave (Pressure Oxidation)
  • Refining: Electrowinning (EW), Induction Furnace

Reports

  • reports/2022_Cortez_Complex_NI43101

Website: https://en.wikipedia.org/wiki/Cortez_Gold_Mine

Report Date: 2022

Region: Nevada

Project Status:

Commodity: Gold

Throughput: 

Mine Life: 

Mine Type: 

Ore type:

Consolidated report summaries

The following former standalone pages about this operation were consolidated here on October 25, 2026. They are retained for source traceability; dates and figures reflect each report’s own effective date and may be superseded by the current information above.

Cortez Joint Venture Operations — 2012 Technical Report

This technical report describes the mineral processing and metallurgical testing for the Cortez Joint Venture operations in Nevada, as of March 2012.

Report context

This NI 43-101 technical report, dated March 16, 2012, was prepared for Barrick Gold Corporation by Roscoe Postle Associates Inc., covering the Cortez Joint Venture operations located in Lander and Eureka Counties, State of Nevada, U.S.A. The report addresses mineral processing and metallurgical testing, mineral resource and reserve estimates, mining methods, and recovery methods.

Processing route

Mineral Processing and Metallurgical Testing

Section 13 of the report covers mineral processing and metallurgical testing for the Cortez Joint Venture operations. The processing facilities and associated metallurgical testwork are described within this section of the technical report.

Recovery Methods

Section 17 of the report details the recovery methods employed at the Cortez Joint Venture operations. This section provides information on the processing facilities and recovery processes used for gold extraction from the various ore sources.

Key reported parameters

Parameter Value Basis
Report date March 16, 2012 Document issue date
Project location Lander and Eureka Counties, Nevada, U.S.A. Report description
Project owner Barrick Gold Corporation Client identification
NI 43-101 compliance Yes Report designation
Report status Final Rev 0 Document control

Project website: https://www.barrick.com/English/operations/nevada-gold-mines/default.aspx

Technical qualifications

This technical report is based on the original NI 43-101 Technical Report on the Cortez Joint Venture Operations, Lander and Eureka Counties, State of Nevada, U.S.A., prepared for Barrick Gold Corporation by Roscoe Postle Associates Inc., dated March 16, 2012. The report contains specific sections on mineral processing and metallurgical testing (Section 13), mineral resource estimates (Section 14), mineral reserve estimates (Section 15), mining methods (Section 16), and recovery methods (Section 17) that form the basis for the processing information presented herein. No information is provided regarding flowsheet details, performance data, economics, ownership structure, current operational status, or external links, as these were not included in the original report sections available.

Mineral processing basics

Scroll to Top