Hammerdown Gold Project — 2026 Technical Report

This report describes the recovery methods for the Hammerdown Gold Project, including proposed new crushing and sorting facilities at the Hammerdown deposit and the existing Pine Cove process plant.

Report context

This technical report for the Hammerdown Gold Project, located in Newfoundland and Labrador, Canada, carries an effective date of February 18, 2026. The report documents the existing Pine Cove process plant, which has operated since 2012 and resumed operations in 2025 after a period of care and maintenance from 2022 to 2025. The Pine Cove process plant commenced treating material from the Hammerdown deposit in Q4 2025. The report also outlines proposed modifications including installation of a three-stage crushing and screening plant with an ore sorting facility at the Hammerdown deposit.

Processing route

Current Operations

The Pine Cove process plant currently treats material via a conventional grind-flotation-leach-Merrill Crowe flowsheet to nominally process 700 t/d material. Run-of-mine material is currently processed via a two-stage crushing plant at the Hammerdown deposit and then hauled to the Pine Cove plant.

Proposed Hammerdown Crushing and Sorting Facility

It is proposed to install a three-stage crushing and sorting facility at the Hammerdown deposit. Testwork demonstrated that the crushed mineralization is highly amenable to sorting, with an average of 50% to 55% of the sorter feed mineralization being separated as waste material and rejected out of the sorting circuit. The crushing and sorting plant is designed to facilitate a throughput of 1,200 t/d with an average life of mine feed grade of approximately 2.19 g/t Au. Both the crushing and sorting circuits will operate at an availability of 73%, resulting in a nominal plant throughput of 137 t/h, with capacity up to 164 t/h to process lower grade material at a higher rate.

The proposed Hammerdown facility will include primary crushing using a vibrating grizzly feeder and jaw crusher in open circuit producing a product P80 of approximately 70 mm, followed by a triple deck vibrating screen with deck openings of 60 mm, 35 mm and 10 mm. The oversize material will feed the secondary crusher. Secondary crushing will use a single stage cone crusher in closed circuit with the triple deck vibrating screen, producing a final product P80 of approximately 40 mm.

Sorting will employ two X-Ray Transmission sorters operating in parallel, processing different size fractions: the primary sorter processing +35 to 60 mm material and the secondary sorter processing +10 to 35 mm feed. Tertiary crushing will use a single stage cone crusher in open circuit producing a final product P80 of approximately 7.1 mm.

Three stockpiles will be produced from the sorting facility: one for crushed product conveyed to a load-out facility and trucked for further processing, screen undersize fines conveyed to its own load-out facility, and the other re-handled to either waste rock or low-grade stockpiles.

Pine Cove Process Plant Description

The Pine Cove process plant consists of primary grinding via a single stage ball mill producing a nominal grind size of P80 of 125 µm, followed by a flotation circuit of rougher and cleaner column flotation cells producing a gold-pyrite concentrate. The concentrate mass pull is approximately 7% to 8%. Flotation concentrate is thickened in a 7.6 m diameter thickener, reground in a regrind ball mill to a nominal size of P80 of less than 20 µm, then leached via cyanidation in mechanically agitated tanks with a residence time of approximately 72 hours.

Leach slurry is dewatered via drum filters and pregnant solution is treated through a Merrill Crowe circuit with leaf filter clarifiers, vacuum de-aeration, zinc dust precipitation, and plate and frame filter presses to recover gold. Filter cake is dried and smelted in an induction furnace with fluxes to produce gold doré and slag.

Tailings are treated via a cyanide destruction circuit using the SO2/air process in two mechanically agitated tanks, with copper sulphate as catalyst, lime for pH control, and SMBS as a source of SO2. Detoxified leach tailings and flotation tailings are pumped to the in-pit tailings storage facility.

Key reported parameters

Parameter Unit Value Basis
Hammerdown Crushing and Sorting Plant
Crushing plant throughput t/d 1,200 Mine plan
LOM average Au head grade g/t 2.19 Mine plan
Plant availability % 73 Industry standard
Nominal plant throughput t/h 137 Engineering calculation
Maximum plant throughput t/h 164 Engineering calculation
ROM top size mm 600 Vendor simulation
Final product P80 mm 7.1 Vendor simulation
Screen undersize P80 mm 6.1 to 7.8 Vendor simulation
Screen undersize % 20 to 27 Vendor simulation
Average sorting gold recovery (HAM) % 92.5 Sorting testwork
Overall circuit recovery (HAM) % 93.1 Sorting testwork
Average sorting gold recovery (ORN) % 89.4 Sorting testwork
Overall circuit recovery (ORN) % 91.7 Sorting testwork
Total circuit reject % 40 Sorting testwork
Primary sorter mass pull % 53 Engineering calculation
Secondary sorter mass pull % 53 Engineering calculation
Sorter feed rejected % 47 Design consideration
Pine Cove Process Plant
Nominal plant throughput t/d 700 Design
Primary grind size P80 µm 125 Design
Regrind size P80 µm <20 Design
Concentrate mass pull % 7 to 8 Operating data
Leach residence time hours 72 Design
Water consumption m³/yr 80,000 (reclaim), 18,000 (raw) Operating data

Project website: https://newfoundgold.ca/new-found-gold-files-hammerdown-gold-project-ni-43-13449/

Project website: https://www.gov.nl.ca/eccc/projects/project-2091/

Project website: https://www.juniorminingnetwork.com/junior-miner-news/press-releases/1227-tsx-venture/mae/191261-maritime-announces-first-gold-from-hammerdown.html

Technical qualifications

This report presents the proposed design for the Hammerdown crushing and sorting facility based on testwork results. Process design criteria and mass balances for the sorting plant were developed from sorting testwork programs. The report notes that the crushing and sorting plant will be designed to handle varying levels of dilution accompanying the mineralization. The Pine Cove process plant description is based on historical operating data since 2012, with operations having been under care and maintenance from 2022 to 2025 before resuming on low-grade stockpiles. The flowsheets presented in the report are simplified representations.

Source: Hammerdown Gold Project Technical Report, Newfoundland & Labrador, Canada, Effective Date: February 18, 2026, Sections 1.14 and 17.

Consolidated report summaries

The following former standalone pages about this operation were consolidated here on October 25, 2026. They are retained for source traceability; dates and figures reflect each report’s own effective date and may be superseded by the current information above.

Hammerdown Gold Recovery: Flotation-Leach & Merrill Crowe

Hammerdown Gold Recovery: Flotation-Leach & Merrill Crowe

Source: New Found Gold Corp (2026)
Website: https://newfoundgold.ca/

Critical Data

Parameter Value Unit Notes
Throughput 1200 tpd Crushing and sorting plant design capacity
Throughput 700 tpd Pine Cove process plant nominal capacity
Mill Power 597 kW Primary ball mill (800 hp)
Target Grind Size 125 μm P80 Primary grinding circuit product
Target Grind Size 20 μm P80 Regrind circuit product (less than)
Head Grade 2.19 g/t Au LOM average feed grade to crushing plant
Recovery % 93.1 % Overall average circuit gold recovery (HAM) including sorting and processing
Processing Capacity 700 tpd Pine Cove plant nominal throughput
Energy Consumption From local grid – No specific kWh/t value reported; propane for heating
Water Consumption 98,000 m³/yr Comprising 80,000 m³/yr tailings reclaim and 18,000 m³/yr raw water
Operating Hours Not specified – Crushing sorting plant availability 73%; Pine Cove expected continuous operation

Overview

New Found Gold Corp.’s Hammerdown Gold Project in Newfoundland & Labrador, Canada, employs a comprehensive gold recovery flowsheet integrating crushing, ore sorting, flotation, cyanidation, and Merrill Crowe precipitation. The Pine Cove process plant, operational since 2012 and recommissioned in 2025 after a care-and-maintenance period, treats material from the Hammerdown deposit. A proposed three-stage crushing and XRT sorting facility at the Hammerdown mine site will reject approximately 47% of sorter feed as waste, upgrading the mill feed grade and reducing downstream processing volume. Sorted material is hauled to Pine Cove, where a single-stage ball mill grinds to a P80 of 125 µm for flotation. A rougher-cleaner flotation circuit produces a gold-pyrite concentrate at 7–8% mass pull, which is thickened, reground to <20 µm, and leached via cyanidation for 72 hours. Gold is recovered from the pregnant solution using the Merrill Crowe process, producing doré bars. Leach residues undergo SO₂/air cyanide destruction before combined flotation and detox tailings are pumped to an in-pit tailings storage facility. The overall average gold recovery from the sorting and processing circuit reaches 93.1%, with the crusher-sorter handling 1,200 t/d and the Pine Cove plant processing a nominal 700 t/d. This integrated approach maximizes resource utilization and economic returns for the Hammerdown project.

Key Process Stages

  • Stage 1: Crushing and Ore Sorting at Hammerdown – Run-of-mine material undergoes three-stage crushing (jaw, secondary cone, tertiary cone) with intermediate screening. A triple-deck vibrating screen separates material into three fractions: +35–60 mm and +10–35 mm feed two XRT ore sorters, while -10 mm fines bypass sorting. The sorters reject approximately 47% of the feed as waste, achieving an average gold recovery of 92.5% in the sorted product. The final crushed product has a P80 of 7.7 mm and is trucked to the Pine Cove plant.
  • Stage 2: Primary Grinding – Crushed material (F80 ~10 mm) is fed to a 3.2 m dia x 4.27 m EGL Marcy ball mill with a 597 kW (800 hp) motor. Process water is added to maintain 75% w/w discharge density. Mill discharge is classified by a 400CVX10 Cavex cyclone in closed circuit, producing a cyclone overflow with P80 of 125 µm for flotation feed.
  • Stage 3: Flotation and Concentrate Regrind – Cyclone overflow reports to a rougher-cleaner flotation circuit comprising three rougher, one cleaner, and one scavenger column cells. PAX and PolyFloat 3330 are collectors, MIBC is frother. The gold-pyrite concentrate (7–8% mass pull) is thickened in a 7.6 m diameter thickener, then reground in a 2.2 m dia x 3.3 m EGL ball mill (185 kW) to P80 <20 µm to liberate gold minerals.
  • Stage 4: Cyanidation and Dewatering – Reground concentrate slurry enters a pre-aeration tank followed by three mechanically agitated leach tanks. Sodium cyanide (pH 10.5–11) and compressed air are added; leach residence time is approximately 72 hours. Leach slurry is dewatered via two drum filters (2.43 m dia x 3.1 m). Pregnant solution is sent to Merrill Crowe; tailings residue goes to detoxification.
  • Stage 5: Gold Recovery and Detoxification – Pregnant solution is clarified in leaf filters, de-aerated in a vacuum tower, then treated with zinc dust to precipitate gold. Precipitates are collected in plate-and-frame filter presses, dried, and smelted in an induction furnace with fluxes to produce gold doré and slag. Leach tailings are detoxified in two agitated tanks using SO₂/air (SMBS and copper sulphate catalyst), then combined with flotation tailings and pumped to an in-pit tailings storage facility.

Additional Interesting Data and Summary

The Hammerdown Gold Project’s recovery methods are designed to efficiently process variable-grade ore while minimizing waste and operating costs. Key technical metrics include a sorting circuit that rejects 47% of the feed mass while retaining 92.5% of the gold, resulting in a final product stream of 700 t/d at an upgraded grade. The XRT sorters operate on two size fractions (+35–60 mm and +10–35 mm) and achieve a mass pull of 53% per machine. The Pine Cove plant’s flotation circuit achieves a concentrate mass pull of 7–8%, which is then reground to less than 20 µm for optimal cyanide leaching. Leaching occurs over 72 hours in three agitated tanks, with cyanide maintained at pH 10.5–11 using sodium hydroxide. Gold recovery via Merrill Crowe involves clarification, de-aeration, zinc precipitation, and smelting to produce doré bars. Environmental management includes a SO₂/air cyanide destruction circuit for leach tailings and in-pit tailings storage for both flotation and detoxified tailings. Water consumption is estimated at 98,000 m³ annually, largely sourced from tailings reclaim, minimizing freshwater demand. The process plant uses electrical power from the local grid and propane for heating. The project benefits from existing infrastructure at Pine Cove, which operated from 2012 to 2022 before a brief care-and-maintenance period and recommissioning in 2025. The integration of ore sorting at Hammerdown significantly reduces the volume of material trucked to the mill, lowering haulage costs and carbon footprint. Future outlook includes potential expansion of throughput based on resource growth and optimization of sorter rejection rates to further enhance feed grade. The overall recovery of 93.1% confirms the technical viability of the flowsheet, positioning the Hammerdown Gold Project as a robust, low-risk development with strong economic fundamentals.


Key Processes: Flotation, Cyanidation, Gravity Separation, Ball Mill, Crushing

Target Commodities: Gold, Copper, Zinc, Lead

Mineral processing basics

Scroll to Top