Critical Data
| Parameter | Value | Unit | Notes |
|---|---|---|---|
| Throughput | 2,000 (sulphide) / 400 (oxide) | tpd | Nominal processing capacities for each circuit |
| Mill Power | N/A | kW | Not specified in report |
| Target Grind Size | N/A | μm | Not specified in report |
| Head Grade | N/A | g/t | Not provided for 2025; refer to resource section |
| Recovery % | 92.9 (Ag), 64.8 (Au), 86.7 (Pb), 84.6 (Zn) | % | Overall plant recoveries in 2025 |
| Processing Capacity | 2,400 | tpd | Combined nominal capacity of sulphide and oxide circuits |
| Energy Consumption | 17 | GW-hr/yr | Annual power consumption from grid and backup generators |
| Water Consumption | 1,200,000 | m³/yr | 83% recirculated from TSF, 17% from underground mine |
| Operating Hours | N/A | hours/day | Not specified in report |
Overview
Pan American Silver Corp. operates the La Colorada Property processing plant in Zacatecas, Mexico, a facility designed to handle two distinct ore types through separate circuits. The plant, which has been in operation with established nominal capacities of 2,000 tpd for sulphide ore and 400 tpd for oxide ore, employs conventional yet highly effective silver recovery methods tailored to each ore’s mineralogy. The sulphide circuit utilizes selective lead-zinc froth flotation to produce high-grade lead and zinc concentrates, capturing 90.6% of the silver in the lead concentrate and 3.5% in the zinc concentrate. The oxide circuit relies on a conventional cyanide leach process followed by Merrill-Crowe zinc precipitation and smelting to produce doré bars. In 2025, overall plant recoveries reached 92.9% for silver, 64.8% for gold, 86.7% for lead, and 84.6% for zinc, underscoring the efficiency of these recovery methods. The significance of La Colorada lies in its dual-circuit design, which allows simultaneous treatment of sulphide and oxide ores from the same mine, maximizing metal extraction and economic returns. Water sustainability is a key feature, with 83% of process water recirculated from the tailings storage facility and the remainder sourced from underground dewatering. Power is supplied from the national grid, supplemented by backup generators, with annual consumption of 17 GW-hr.
Key Process Stages
- Stage 1: Sulphide Ore Crushing & Grinding – Ore from an 8,000 t stockpile is fed via apron feeder to a C-100 jaw crusher, reducing material to minus 6 inches. The crushed ore passes over a double-deck 2.4 × 6.1 m screen; oversize reports to a short head crusher in closed loop, while undersize is stored in two 800 t fine ore bins. Material is then ground in a 4.0 × 5.7 m ball mill in closed circuit with cyclones to achieve the target particle size for flotation.
- Stage 2: Lead Flotation Circuit – Cyclone overflow enters a lead flotation bank of six 30 m³ tank cells (four rougher, two scavenger). Rougher concentrate is cleaned in six 10 m³ cells across two stages. Cleaner concentrate reports to a 7.0 m diameter thickener; underflow is filtered in a filter press to produce a lead concentrate cake averaging 44.4% Pb. Thickener overflow returns as process water.
- Stage 3: Zinc Flotation Circuit – Lead scavenger tailings are conditioned with reagents in a 4.3 m diameter tank, then fed to six 30 m³ zinc flotation cells (four rougher, two scavenger). Rougher concentrate is cleaned in six 10 m³ cells. Cleaner concentrate thickens in an 8.0 m diameter thickener and is filtered to produce a zinc concentrate cake averaging 57.4% Zn. Tailings from the scavenger circuit proceed to classification for backfill or disposal.
- Stage 4: Oxide Ore Crushing, Grinding & Leaching – Oxide ore is jaw-crushed (600 × 900 mm), screened, and secondary cone-crushed in closed loop. Fine ore is ground in a 2.9 × 3.4 m ball mill in closed circuit with cyclones; a second 2.4 × 3.0 m ball mill provides additional grinding. Dilute cyanide solution initiates gold and silver leaching in the grinding circuit. Cyclone overflow reports to two 7.9 × 2.4 m primary leach thickeners, then passes through seven agitated leach tanks, an intermediate thickener, four more leach tanks, and four countercurrent rinse thickeners to maximize metal recovery and minimize cyanide in tailings.
- Stage 5: Merrill-Crowe Precipitation & Doré Smelting – Pregnant leach solution is clarified and deoxygenated in a vacuum tower. Zinc dust is added to precipitate gold and silver. The metal precipitate is separated via filter presses; barren solution returns as process water. The precipitate is mixed with fluxes and smelted in a gas-fired furnace, then cast into doré bars for shipment.
Additional Interesting Data and Summary
The La Colorada processing plant’s dual-circuit design provides operational flexibility to handle varying ore types from the same deposit, optimizing overall silver recovery methods. While head grades are not detailed in Section 17, the 2025 recovery performance—92.9% for silver, 64.8% for gold, 86.7% for lead, and 84.6% for zinc—demonstrates high efficiency. The sulphide circuit achieves 90.6% of silver into the lead concentrate (44.4% Pb grade) and 3.5% into the zinc concentrate (57.4% Zn grade), highlighting the selectivity of the flotation circuit. Reagent consumption is well-documented: sulphide ore uses 0.56 kg/t grinding media and 1.0 kg/t lime; oxide ore uses 0.80 kg/t grinding media, 4.6 kg/t lime, and 3 kg/t sodium cyanide. Environmental considerations include a lined tailings storage facility for fine tailings and hydraulic backfill for coarse material from the sulphide circuit, reducing surface disposal. Water conservation is a major sustainability initiative: 83% of the plant’s water (approximately one million cubic metres per year) is recirculated from the tailings storage facility, and the remaining 17% (200,000 m³) comes from underground dewatering, fully meeting process requirements. Energy consumption of 17 GW-hr annually is supplied by the national grid with backup diesel generators. Economic impact is driven by the production of high-grade lead and zinc concentrates and doré bars shipped to smelters and refineries. Future outlook for the La Colorada property includes continued optimization of the flotation circuit and leaching parameters to further improve recoveries, especially for gold. The facility’s robust design and sustainable water management position it well for long-term operation, contributing significantly to Pan American Silver’s portfolio as a major silver producer in Zacatecas, Mexico.
Key Processes: Flotation, Cyanidation, Ball Mill, Crushing
Target Commodities: Gold, Silver, Zinc, Lead
Technical report and processing history
The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.
La Colorada — 2023 Technical Report (Section 17)
La Colorada — 2023 Technical Report (Section 17)
| Company | Pan American Silver Corp. |
| Mine | La Colorada |
| Date | 2023 |
| Commodities | Silver, Gold, Lead, Zinc |
Executive Summary
The La Colorada processing plant operates two distinct circuits designed to treat sulphide and oxide ores separately. The sulphide circuit has a nominal capacity of 2,000 tpd and utilizes a conventional flotation process to produce lead and zinc concentrates. In 2023, this circuit achieved metallurgical recoveries of 93% for silver, 58% for gold, 86% for lead, and 84% for zinc. The oxide circuit processes 400 tpd using a cyanide leach process followed by Merrill-Crowe precipitation to produce doré, with recoveries averaging 82% for silver and 43% for gold.
Both circuits employ crushing and grinding stages prior to their respective recovery methods. Sulphide ore undergoes crushing and ball milling before entering lead and zinc flotation circuits involving rougher, scavenger, and cleaner stages. Oxide ore is crushed, ground, and leached in agitated tanks with dilute cyanide solution. The resulting pregnant solution is clarified, deoxygenated, and treated with zinc dust to precipitate metals before smelting into doré bars.
Water management is integrated across both circuits, with 78% of processing water sourced from recirculation of the tailings storage facility and 22% from underground mine dewatering. Power is supplied from the national grid with backup generators. Reagent consumption varies by ore type, with oxide ore requiring sodium cyanide and higher lime consumption compared to sulphide ore.
Website: https://panamericansilver.com/operations/silver-segment/la-colorada/
Report Date: 2023
Region:
Project Status:
Commodity: Silver, Gold, Lead, Zinc
Throughput:
Mine Life:
Mine Type:
Ore type:
2019 Technical Report — Pan American Silver Corp
2019 Technical Report — Pan American Silver Corp
| Company | Pan American Silver Corp |
| Date | 2019-12-31 |
| Commodities | Gold, Silver, Lead, Zinc |
| Mine Type | Underground |
| Status | Operating |
Executive Summary
This technical report section details the recovery methods for Pan American Silver Corp’s property, which utilizes separate oxide and sulphide processing circuits. The oxide plant operates at a nominal capacity of 400 tonnes per day, employing a conventional cyanide leach process involving crushing, grinding, leaching, Merrill-Crowe zinc precipitation, and smelting to produce doré. Metallurgical recoveries in this circuit average 84% for silver and 48% for gold.
The sulphide plant operates at a nominal capacity of 1,400 tonnes per day, regularly achieving 1,700 tonnes per day. It utilizes a conventional flotation process with crushing, grinding, and selective lead and zinc froth flotation circuits to produce concentrates. Recoveries in the sulphide plant average 93% for silver, 61% for gold, and 88% for both lead and zinc. The facility sources power from the national grid and water from underground mine dewatering, tailings storage, and wells.
Website: https://panamericansilver.com/
Report Date: 2019-12-31
Region:
Project Status: Operating
Commodity: Gold, Silver, Lead, Zinc
Throughput:
Mine Life:
Mine Type: Underground
Ore type:
La Colorada — 2013 Technical Report
La Colorada — 2013 Technical Report
| Company | Pan American Silver (PAS) |
| Mine | La Colorada |
| Date | 2013 |
| Region | Zacatecas, Mexico |
| Commodities | Silver, Gold, Lead, Zinc |
Executive Summary
The La Colorada mine operates two independent ore processing circuits for oxide and sulphide materials, sharing a common crushing plant. The oxide plant has a capacity of 650 tpd, while the sulphide plant operates at 750 tpd. Ore from the transition zone is typically treated as oxide. Processing occurs on two 12-hour shifts daily, seven days a week. The mine is an underground operation with a long-term plan extending to 2027.
The oxide circuit utilizes a conventional cyanide leach flowsheet involving crushing, grinding in ball mills, leaching in agitated tanks, and Merrill Crowe zinc precipitation to produce doré bars. The sulphide circuit employs a selective flotation flowsheet to recover lead and zinc concentrates, with tailings managed via hydraulic backfill or surface storage. Metallurgical recoveries have remained relatively constant, with silver recovery averaging 82.4% for oxide and 92.7% for sulphide circuits.
Long-term planning indicates a shift towards sulphide ore as oxide reserves deplete, with processing of oxide ore scheduled to end in 2019. A hydraulic backfill plant commissioned in 2011 reduces surface tailings storage needs. An expansion study proposes increasing sulphide capacity to 1,500 tpd, involving new SAG and ball mills and expanded flotation circuits.
Website: https://panamericansilver.com/operations/silver-segment/la-colorada/
Report Date: 2013
Region: Zacatecas, Mexico
Project Status:
Commodity: Silver, Gold, Lead, Zinc
Throughput:
Mine Life:
Mine Type:
Ore type: