| Company | Nevada Zinc Corp. |
| Date | 2024 |
| Region | Nevada |
| Commodities | Zinc |
Executive Summary
The Lone Mountain Project Technical Report outlines the preliminary mineral processing flow sheet for the project. The design includes crushing, grinding, and zinc flotation to produce zinc concentrate for sale. The plant throughput is 800 dry tonnes per day, operating at 95% availability, resulting in approximately 277,000 dry tonnes annually.
The process involves a two-stage crushing circuit using portable equipment, followed by wet-overflow ball mill grinding to a P80 of 75 microns. Flotation recovery utilizes rougher, scavenger, and three-stage cleaner circuits to achieve a final concentrate grade of 45% zinc with 80% recovery. Tailings are dewatered in thickeners prior to disposal.
Website: https://nevadazinc.com/lone-mountain
Report Date: 2024
Region: Nevada
Project Status:
Commodity: Zinc
Throughput:
Mine Life:
Mine Type:
Ore type:

