Middle Tennessee Mines — 2021 Technical Report

Company ERL
Date 2021
Region Tennessee, USA
Commodities Zinc

Executive Summary

This NI 43-101 Technical Report covers the Middle Tennessee Mines (MTM) project, operated by Nyrstar. ERL acts as a royalty holder for the project and is exempted under Section 9.2 of NI 43-101 from providing direct operational disclosure as the information is not available to them. The report relies on technical data provided by Nyrstar in November 2021.

The project consists of three facilities: Gordonsville, Elmwood, and Cumberland. Ore mined at these sites is processed into zinc concentrate at the Gordonsville concentrator, which was commissioned in 1978. The plant employs conventional technology including crushing, heavy media separation, ball milling, and flotation. Zinc concentrates are filtered and transported approximately 100 miles to a Nyrstar zinc refinery outside Clarksville, Tennessee.

No current public domain information is available regarding process plant layout, throughput, metallurgical recovery, or grade for this report. The data reflects the operational status as of the 2021 technical report period.

Website: https://www.electricroyalties.com/news/2023-news

Report Date: 2021

Region: Tennessee, USA

Project Status:

Commodity: Zinc

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics

Scroll to Top