Lumwana Mine: Copper Processing Plant Expansion

Overview

The Lumwana processing plant is a major copper concentrator that was originally designed for 20 Mtpa throughput but expanded to 27 Mtpa in 2020. The facility is undergoing a significant expansion project to double capacity to 54 Mtpa, featuring parallel processing plants with advanced crushing, grinding, and flotation circuits.

Key Process Stages

  • Primary Crushing: Four gyratory crushers (existing + expansion) with variable-speed apron feeders and overland conveyors to coarse ore stockpiles
  • Grinding: Two parallel SABC circuits (SAG mill + ball mill + pebble crusher) with cyclone classification to P80 300 µm
  • Flotation: Three parallel rougher trains with forced-air mechanisms, followed by multi-stage cleaner circuits with high-intensity cells
  • Concentrate Dewatering: Thickening followed by pressure filtration (two parallel filters) with automated cake handling
  • Tailings Management: Cyclone-thickener combination systems with underflow pumping to TSF

Critical Data

Parameter Value
Design Throughput 54 Mtpa (peak)
Power Demand 107 MW (steady-state)
Water Consumption 38.2 Mm³/yr (reclaim) + 10.4 Mm³/yr (raw)
Grinding Product Size P80 300 µm
SAG Mill Power 16 MW (each)
Ball Mill Power 18 MW (each)

Expansion Highlights

  • New parallel processing plant with identical SABC grinding circuit
  • Upgraded flotation with high-intensity cells and improved reagent systems
  • Advanced process control with online particle size and metal grade analyzers
  • Enhanced metallurgical accounting with automated sampling and analysis
  • Doubled filtration capacity with new pressure filter installation

Based on filing data from 2024-2025.