Executive Summary

This report section details the recovery methods designed for the Magino Project crushing and processing facilities. The process plant is designed for a throughput of 10,000 tonnes per day with an average gold head grade of 1.15 g/t, targeting a life of mine gold recovery of 91.8%. The flowsheet includes primary and secondary crushing, followed by grinding in a semi-autogenous (SAG) mill and ball mill.

The circuit utilizes a trommel screen for SAG mill discharge classification and cyclones for ball mill discharge. A gravity circuit removes coarse gold prior to leaching. The ground product is thickened before entering a Carbon-in-Pulp (CIP) circuit where lime and cyanide are dosed for 30 hours. Loaded carbon is stripped via an AARL elution circuit and electrowinning to recover gold and silver. Tailings undergo cyanide destruction before disposal to the TMF.

Website: https://www.alamosgold.com/news-and-events/news/news-details/2026/Alamos-Gold-Reports-Mineral-Reserves-and-Resources-for-the-Year-Ended-2025/default.aspx

Report Date: Not Specified

Region: Not Specified

Project Status:

Commodity: Gold, Silver

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Mineral processing basics