Marimaca Project — 2020 Technical Report

Company Marimaca Copper
Date 2020
Region Chile
Commodities Copper
Mine Type Open Pit
Throughput 5.4 – 9.0 Mt/y
Mine Life 12 years
Annual Production 40,000 t/y Cu
Status Development

Executive Summary

The Marimaca Project is a 12-year development-stage mining operation located in Chile, designed to produce Grade-A copper cathodes through a conventional salt acid leaching process. The project utilizes a comminution circuit followed by crushed mineralized material heap leaching and ROM leach facilities, coupled with Solvent Extraction (SX) and Electrowinning (EW) plants. The process relies on seawater-based solutions with sulphuric acid and salt addition to leach both oxide and sulphide copper mineralization.

The mine plan is divided into two phases. Phase 1 (Years 1-5) focuses on oxide mineralization with a processing capacity of 5.4 Mt/y, while Phase 2 (Years 6-12) expands to 9.0 Mt/y, incorporating a higher proportion of sulphide copper mineralization. The facility is designed for a nominal capacity of 40,000 t/y of copper cathodes, with total LOM production estimated at approximately 430 kt of cathodes. Recovery rates are projected at 79% for Phase 1 and 74% for Phase 2.

Water management is a critical component, utilizing a dedicated reverse osmosis plant for SX/EW requirements and recovering brine reject as process water. The process includes a three-stage crushing circuit, agglomeration drums, and a two-stage leaching cycle involving Intermediate Leach Solution (ILS) and raffinate. The project is currently in the PEA stage as of 2020.

Operational Details

Processing Methods

Reports

Website: https://marimaca.com/marimaca-copper-project-overview/

Report Date: 2020

Region: Chile

Project Status: Development

Commodity: Copper

Throughput: 5.4 – 9.0 Mt/y

Mine Life: 12 years

Mine Type: Open Pit

Ore type:

Technical report and processing history

The following archived source profiles have been consolidated here to preserve the project’s processing history and study context.

Technical Report for the Marimaca Copper Deposit

Technical Report for the Marimaca Copper Deposit

Company Coro Mining Corp NCL SpA
Mine Marimaca
Date Unknown
Region Unknown
Commodities Copper

Executive Summary

This technical report covers the Marimaca Copper Deposit, presented by Coro Mining Corp NCL SpA. The document outlines the technical aspects of the project, specifically focusing on recovery methods and project infrastructure.

The primary recovery method identified for the Marimaca deposit involves heap leaching techniques. This process is designed to produce copper cathode through a Solvent Extraction and Electrowinning (SXEW) circuit. The report snippet provided covers Section 15 on Recovery Methods, along with references to Project Infrastructure and Adjacent Properties.

While specific operational metrics such as throughput and mine life are not detailed in this excerpt, the strategic focus remains on the efficient extraction of copper via heap leach methods. Further details regarding the project’s infrastructure and surrounding geological context are included in subsequent sections of the full technical report.

Entities

  • entities/Marimaca_Mine

Website: https://www.listcorp.com/asx/mc2/marimaca-copper-corp/news/marimaca-announces-mod-feasibility-study-3232257.html

Report Date: Unknown

Region: Unknown

Project Status:

Commodity: Copper

Throughput: 

Mine Life: 

Mine Type: 

Ore type: