Parks/Salyer Project — 2021 Technical Report

Cactus Project conceptual processing facilities flow diagram
Company Not Specified
Date 2021

Executive Summary

This excerpt from Section 17.0 Recovery Methods clarifies the relationship between the current mineral resource estimate and the 2021 Cactus PEA. It confirms that the resource estimate date is 01 March 2021 and economic assessment inputs are valid as of 31 August 2021. The report states that the results of the 2021 Cactus PEA are considered current and have been carried over for this report.

The mineral resource estimate for the Parks/Salyer Project as described in this report was not included in the 2021 Cactus PEA and it does not have a negative impact on or otherwise adversely affect the mineral resource estimate that formed the basis of the 2021 Cactus PEA.

The results and conclusions of the 2021 Cactus PEA are still considered current and therefore have been carried over for this report. Specific operational details such as processing methods, mine type, and commodities are not detailed in this excerpt.

Reports

  • entities/Parks_Salyer_Project

Website: https://arizonasonoran.com/projects/exploration/overview/

Report Date: 2021

Region: 

Project Status:

Commodity: 

Throughput: 

Mine Life: 

Mine Type: 

Ore type: 

Process diagrams from the technical report

Historic Sacaton Concentrator Flow Diagram
Figure 13-17, technical-report PDF page 152.