| Company | Source Energy Services Ltd. |
| Date | 2019 |
| Region | Not Specified |
| Commodities | Silica Sand |
Executive Summary
The Preston Property processing operations are designed to wash, dry, and sort ROM sandstone to produce high-quality frac sand suitable for hydraulic fracturing. The process involves crushing the raw material to manageable sizes without damaging individual grains, followed by separation by size, shape, and density in a wet-processing plant. The wet plant produces work-in-process material which is then dried and sorted in a dry-processing plant to yield final products such as 20/40, 30/50, 40/70, and 100 Mesh frac sand.
Major processing assets include a crushing plant with a 250,000 short ton ROM stockpile and a Metso impact crusher, a wet-processing plant with a nameplate capacity of 450 short tons per hour utilizing hydrosizers and cyclones, and a dry-processing plant with a capacity of 180 tph featuring a Carrier fluid bed dryer and Rotex mineral separators. The crushing and wet-processing operations are weather-dependent, running from March through November, while the dry-processing plant operates year-round.
Historical production from 2014 to 2019 totaled over 5.12 million short tons of finished frac sand. Quality control measures, including laboratory sampling, are implemented throughout the wet and dry processing stages. Based on site visits and provided information, the current processing operations and equipment are deemed suitable for their intended purpose.
Website: https://www.sourceenergyservices.com/news-releases/source-energy-services-ltd-files-updated-ni-43-101-technical-reports-for-its-mineral-projects-in-wisconsin-united-states
Report Date: 2019
Region: Not Specified
Project Status:
Commodity: Silica Sand
Throughput:
Mine Life:
Mine Type:
Ore type:

