| Date | 2014-07-09 |
| Commodities | Gold |
Executive Summary
This section of the technical report outlines the proposed recovery methods for the project, focusing on the rehabilitation and utilization of an existing PL mill. The study proposes a processing flowsheet that is anticipated to be satisfactory, subject to future testwork confirming process modifications and equipment additions. The initial throughput rate for this study is set at 900 t/d, which will yield a nominal grind (K80) of approximately 110 microns utilizing the existing crushing and grinding circuits.
Based on planned tonnage and grade, and assuming continuous stable operation, an overall gold recovery of 90% is projected. This recovery estimate is preliminary and should be confirmed by testwork on samples representing the current mining plan. The report indicates that while the present flowsheet is expected to be satisfactory, further validation is required to ensure operational stability and recovery targets are met.
The proposed rehabilitation of the existing mill suggests a cost-effective approach to processing, leveraging current infrastructure to achieve the desired throughput and recovery rates. The focus remains on maintaining stable operation to meet the projected 90% gold recovery target, with the understanding that future testwork may refine the processing parameters.
Reports
Website: https://www.legisquebec.gouv.qc.ca/fr/document/rc/q-2,%20r.%2040.1/20221230?langCont=en
Report Date: 2014-07-09
Region:
Project Status:
Commodity: Gold
Throughput:
Mine Life:
Mine Type:
Ore type: