Santa María Silver Project — 2018 Technical Report

Figure 17-1: Simplified Process Flow Diagram
Company Golden Minerals Company
Date November 2018
Region Santa Bárbara, Chihuahua, Mexico
Commodities Silver, Gold
Mine Type Not Specified
Throughput 250 tpd
Status Development

Executive Summary

The 2018 Preliminary Economic Assessment for the Santa María Silver Project outlines the proposed recovery methods for the project’s mineral resources. The plan involves toll-milling both mixed and sulfide materials at an external facility equipped with sulfide flotation circuits. The maximum throughput for the flotation circuit is set at 250 tonnes per day, designed to produce a bulk sulfide silver-gold bearing concentrate.

Oxide ore is designated for cyanide leaching at the toll-milling facility. Testwork indicates an option to process mixed and sulfide tailings in the leach circuit to improve gold and silver recovery. While a zinc flotation circuit exists downstream of the lead circuit at the facility, it is not utilized in the proposed flowsheet, though it offers flexibility for alternative processing strategies.

Reports

Website: https://www.goldenminerals.com/news/golden-minerals-completes-sale-of-santa-maria-gold-silver-property

Report Date: November 2018

Region: Santa Bárbara, Chihuahua, Mexico

Project Status: Development

Commodity: Silver, Gold

Throughput: 250 tpd

Mine Life: 

Mine Type: Not Specified

Ore type: 